Velarion Records
Follow this permit Velarion Records emails you this permit’s record, cited to the public filing, and tells you when the register changes it. Free.
We’ll email you a link to confirm. The continuous daily watch on every change is the paid alert. Unsubscribe any time.
Also free: The Pay Desk, the weekly executive pay briefing.

Clean Water Act discharge permit · NPDES IDR10C1V3

INSPIRADO PHASE 3, Meridian, ID: NPDES IDR10C1V3 discharge permit, effluent exceedances, inspections, penalties

INSPIRADO PHASE 3, held by Antonov Star Development, holds NPDES permit IDR10C1V3, which discharges to Phyllis Canal. EPA’s file records it issued January 10, 2022 and expiring February 9, 2027.

INSPIRADO PHASE 3, Meridian, Idaho: Coverage under a general permit IDR10C1V3, held by Antonov Star Development; Construction stormwater; Effective; issued January 10, 2022, term to February 9, 2027; discharges to Phyllis Canal.

Idaho holds 3,630 Construction stormwater coverages of this permit type in EPA’s file; 576 were issued before IDR10C1V3. Antonov Star Development holds 2 permits in Idaho.

Other permits held by Antonov Star Development

Coverages issued nearest IDR10C1V3

INSPIRADO PHASE 3 among its neighbors

EPA’s permit file holds 141 discharge permits in the South Slough-Boise River subwatershed (HUC 170501140405), IDR10C1V3 among them. Its county holds 668, 5 of them major permits; IDR10C1V3 is a minor permit.

Other permits in the South Slough-Boise River subwatershed (HUC 170501140405)

What the register holds for INSPIRADO PHASE 3: its NPDES ID, its permit type and status, its dates, its address in Meridian, Idaho, its receiving water. EPA’s effluent violation file and its single-event violation file hold no violation for NPDES IDR10C1V3.

Identity

Facility as filedINSPIRADO PHASE 3
Permittee as filedAntonov Star Development
NPDES IDIDR10C1V3
Permit statusEffective
Permit typeCoverage under a general permit
Discharger classMinor discharger
Facility typeNot a publicly owned treatment works
ProgramConstruction stormwater
IssuedJanuary 10, 2022
Expiration dateFebruary 9, 2027
AddressMeridian, ID 83646
Receiving waterPhyllis Canal
SubwatershedSouth Slough-Boise River (HUC 170501140405)

Effluent limits and exceedances

EPA’s limits and effluent violation files hold no pollutant row for NPDES IDR10C1V3.

Inspections, violations and enforcement

EPA’s single-event violation file, as loaded, holds no violation for NPDES IDR10C1V3.

Inspections

EPA’s inspection file holds no inspection for NPDES IDR10C1V3.

Formal enforcement and penalties

0 formal actions, 0 of them with a penalty assessed. Federal and state penalties are separate figures from separate authorities and are shown as each was filed, never added together.

Informal enforcement

EPA’s informal enforcement file holds no action for NPDES IDR10C1V3.

Watch this permit

One permit holder, $99/month. Watch the register for one permit holder and the places and receiving waters tied to its permits. Choose “One permit holder” and enter this permit’s NPDES ID, IDR10C1V3.

Start the watch

How often?
  • One permit holder — $99/month
  • One watershed — $2,990/year
  • One state — $4,990/year
  • The whole register — $18,000/year

How we handle your data → Privacy

Nearby on the register

Figures from EPA’s ICIS-NPDES download, loaded September 15, 2026.

What this page shows

The INSPIRADO PHASE 3 permit, filed under the permittee Antonov Star Development, is one of 561 storm water construction permits in Ada County, and 0.0% of those permits have a violation on file. It sits within the South Slough-Boise River subwatershed, which includes 141 NPDES permits, this one included. Among the 451 storm water construction permits in Ada County, 8.4% carry an earlier issue date than this permit's January 10, 2022.