Clean Water Act discharge permit · NPDES IDR10C1XC
ELEMENT RIDGE SUBDIVISION NO. 2, Caldwell, ID: NPDES IDR10C1XC discharge permit, effluent exceedances, inspections, penalties
- EffectivePermit status
- MinorDischarger class
- 0Pollutants under a numeric limit
- 0Pollutants with an effluent exceedance
- 0Inspections on file
- 0Formal enforcement actions
ELEMENT RIDGE SUBDIVISION NO. 2, held by Lennar Homes of Idaho, LLC, holds NPDES permit IDR10C1XC, which discharges to Forrest Canal. EPA’s file records it issued January 10, 2022 and expiring February 9, 2027. The status and dates are as EPA’s permit file stood when Velarion loaded it (September 15, 2026); EPA’s free Detailed Facility Report on ECHO carries the permit’s current standing.
What the register holds for ELEMENT RIDGE SUBDIVISION NO. 2: its NPDES ID, its permit type and status, its dates, its address in Caldwell, Idaho, its receiving water. EPA’s effluent violation file and its single-event violation file hold no violation for NPDES IDR10C1XC.
Identity
| Facility as filed | ELEMENT RIDGE SUBDIVISION NO. 2 |
|---|---|
| Permittee as filed | Lennar Homes of Idaho, LLC |
| NPDES ID | IDR10C1XC |
| Permit status | Effective |
| Permit type | Coverage under a general permit |
| Discharger class | Minor discharger |
| Facility type | Not a publicly owned treatment works |
| Program | Construction stormwater |
| Issued | January 10, 2022 |
| Expiration date | February 9, 2027 |
| Address | Caldwell, ID 83607 |
| Receiving water | Forrest Canal |
| Subwatershed | Dixie Slough (HUC 170501140802) |
Cited to the EPA ICIS-NPDES permit file (ECHO download).
Effluent limits and exceedances
- 0Pollutants on file
- 0Under a numeric limit
- 0With a violation of any kind
- 0With an effluent exceedance
EPA’s limits and effluent violation files hold no pollutant row for NPDES IDR10C1XC.
Cited to the EPA ICIS-NPDES limits and effluent violations files (ECHO download); up to 60 rows shown, most exceedances first.
Inspections, violations and enforcement
- 0Single-event violations
EPA’s single-event violation file, as loaded, holds no violation for NPDES IDR10C1XC.
Inspections
EPA’s inspection file holds no inspection for NPDES IDR10C1XC.
Formal enforcement and penalties
0 formal actions, 0 of them with a penalty assessed. Federal and state penalties are separate figures from separate authorities and are shown as each was filed, never added together.
Informal enforcement
EPA’s informal enforcement file holds no action for NPDES IDR10C1XC.
Cited to the EPA ICIS-NPDES violation, inspection and enforcement files (ECHO download); up to 50 rows of each shown, newest first.
Watch this permit
One permit holder, $99/month. Watch the register for one permit holder and the places and receiving waters tied to its permits. Choose “One permit holder” and enter this permit’s NPDES ID, IDR10C1XC.
Start the watch
- One permit holder — $99/month
- One watershed — $2,990/year
- One state — $4,990/year
- The whole register — $18,000/year
How we handle your data → Privacy
EPA publishes a free Detailed Facility Report for every permit on ECHO: its compliance status quarter by quarter, its inspections, and its enforcement actions and penalties. EPA also sends free notices of new inspections and enforcement actions through ECHO Notify; enter NPDES ID IDR10C1XC there.
ELEMENT RIDGE SUBDIVISION NO. 2, Caldwell, Idaho: Coverage under a general permit IDR10C1XC, held by Lennar Homes of Idaho, LLC; Construction stormwater; Effective; issued January 10, 2022, term to February 9, 2027; discharges to Forrest Canal.
Idaho holds 3,630 Construction stormwater coverages of this permit type in EPA’s file; 576 were issued before IDR10C1XC. Lennar Homes of Idaho, LLC holds 13 permits in Idaho.
Other permits held by Lennar Homes of Idaho, LLC
- CIRRUS POINTE SUBDIVISION NO. 9, Caldwell: IDR10C15M, issued January 10, 2022
- SOTERRA SUBDIVISION - PHASE 1 (LENNAR), Caldwell: IDR10C1IH, issued January 10, 2022
- JOPLIN RIM SUBDIVISION, Meridian: IDR10C1II, issued January 10, 2022
- BENTLEY MEADOWS SUBDIVISION, Nampa: IDR10C1OE, issued January 10, 2022
- EWING MEADOWS SUBDIVISION NO. 2 & 3, Meridian: IDR10C1Q5, issued January 10, 2022
- BARATZA SUBDIVISION PHASE 1 & LEMP CANAL REALIGNMENT, Meridian: IDR10C1Q6, issued January 10, 2022
- JAYHAWK CREEK SUBDIVISION (LENNAR), Caldwell: IDR10C1TJ, issued January 10, 2022
- BARATZA SUBDIVISION PHASE 2 & MASS GRADING, Meridian: IDR10C1V1, issued January 10, 2022
- EAST RANCH SUBDIVISION NO. 1 & MASS GRADING, Nampa: IDR10C1WZ, issued January 10, 2022
- ELEMENT RIDGE SUBDIVISION NO. 1, Caldwell: IDR10C1XB, issued January 10, 2022
Coverages issued nearest IDR10C1XC
- January 10, 2022: LINROCK SUBDIVISION NO. 3, Meridian, IDR10C1X7, held by Trilogy Development, Inc.
- January 10, 2022: PURDAM SEWER EXTENSION (+ NEW EASEMENT), Nampa, IDR10C1X8, held by IMCO-KRC JV, LLC
- January 10, 2022: ROGUE CREDIT UNION MERIDIAN, Meridian, IDR10C1X9, held by Titan Excavation & Construction Inc.
- January 10, 2022: ESCALON PARK SUBDIVISION BRIDGE, Caldwell, IDR10C1XA, held by Trilogy Development, Inc.
- January 10, 2022: ELEMENT RIDGE SUBDIVISION NO. 1, Caldwell, IDR10C1XB, held by Lennar Homes of Idaho, LLC
- January 10, 2022: GRAND CENTRAL SUBDIVISION, Nampa, IDR10C1XD, held by Steward Land Pursuit
- January 10, 2022: HOMEDALE WATER IMPROVEMENTS, Homedale, IDR10C1XE, held by Warrington Construction
- January 10, 2022: ORCHARD HEIGHTS SUBDIVISION NO. 1, Fruitland, IDR10C1XF, held by Trilogy Development, Inc.
- January 10, 2022: BEAR LAKE NORTH BEACH REDESIGN, Saint Charles, IDR10C1XG, held by Whitaker Construction
- January 10, 2022: PROMENADE, Meridian, IDR10C1XH, held by Brownstone Construction Management
ELEMENT RIDGE SUBDIVISION NO. 2 among its neighbors
EPA’s permit file holds 62 discharge permits in the Dixie Slough subwatershed (HUC 170501140802), IDR10C1XC among them. Its county holds 377, 2 of them major permits; IDR10C1XC is a minor permit.
Other permits in the Dixie Slough subwatershed (HUC 170501140802)
- 10TH AVENUE HEIGHTS, Caldwell: IDR100349, not classed
- ALYSON MEADOWS SUBDIVISION, Caldwell: IDR10C23O, minor permit, discharging to A Drain, permit term to February 9, 2027
- ARROWROCK FARM SUBDIVISION NO 1 (CHALLENGER), Caldwell: IDR10C21C, minor permit, discharging to Phyllis Canal, permit term to February 9, 2027
- ARROWROCK FARM SUBDIVISION NO. 2, Caldwell: IDR10C1VN, minor permit, discharging to Deer Flat Caldwell Canal, permit term to February 9, 2027
- BEAR LANE PAVEMENT REHAB 2024, Caldwell: IDR10L0DK, not classed
- BRIAN AVENUE APARTMENTS, Caldwell: IDR10C0HJ, minor permit, discharging to Irrigation Drainage, permit term to February 9, 2027
- BROTHER'S PARK, Caldwell: IDR10L00N, not classed, permit term to November 1, 2021
- BROTHER'S PARK EXPANSION, Caldwell: IDR10L005, not classed, permit term to November 1, 2021
- BUD'S MARKETPLACE, Caldwell: IDR10C1E0, minor permit, discharging to Forest Canal, permit term to February 9, 2027
- CALDWELL PARKS & REC - NEW OFFICE, Caldwell: IDR10L025, not classed, permit term to December 31, 2022
Nearby on the register
- Discharge permits in Caldwell
- Every permit record in Caldwell, A to Z
- Discharge permits in Idaho
- Every permit record in Idaho, A to Z
Figures from EPA’s ICIS-NPDES download, loaded September 15, 2026.