NPDES IDR10C26G · Clean Water Act
COOPER CROSSING, Parma, ID: NPDES IDR10C26G discharge permit, effluent exceedances, inspections, penalties
COOPER CROSSING, Parma, Idaho: General permit coverage IDR10C26G, held by Eells Construction; Construction stormwater; Effective; issued January 10, 2022, term to February 9, 2027; discharges to Sand Hollow Creek.
Idaho holds 3,630 Construction stormwater coverages of this permit type in EPA’s file; 576 were issued before IDR10C26G.
Coverages issued nearest IDR10C26G
- 2022-01-10: TAXI LANE S EXTENSION WIDENING & RECONSTRUCTION, Boise: IDR10C26B, held by Knife River Corporation - Mountain West
- 2022-01-10: GRAND CENTRAL, Nampa: IDR10C26C, held by Lennar Homes of Idaho, LLC
- 2022-01-10: FRAZIER INDUSTRIAL PEMB, Idaho Falls: IDR10C26D, held by Engineered Structures Inc.
- 2022-01-10: MT. NORD SUBDIVISION, Tetonia: IDR10C26E, held by DSD Construction
- 2022-01-10: RIVERBEND COMMONS (SEVEN TWO ONE), Eagle: IDR10C26F, held by Seven Two One
- 2022-01-10: FY24 RDWY & ADA IMPROVEMENTS ON EISENMAN RD, Boise: IDR10C26H, held by Ada County Highway District
- 2022-01-10: VALNOVA LOT 29 PHASE 2, Eagle: IDR10C26I, held by GWC Capital dba Valnova LLC
- 2022-01-10: USTICK & LAKE APARTMENTS, Caldwell: IDR10C26J, held by Brighton Construction, Inc.
- 2022-01-10: NORSE LANDING-LCI, Caldwell: IDR10C26K, held by Lurre Construction Inc
- 2022-01-10: MICRON HANGAR (BOI), Boise: IDR10C26L, held by BOISE AIRPORT (City of Boise)
COOPER CROSSING among its neighbors
10 discharge permits are in the Lower Sand Hollow Creek subwatershed (HUC 170501140704); IDR10C26G is one. Its county: 377, 2 major; IDR10C26G is minor permit.
Other permits in the Lower Sand Hollow Creek subwatershed (HUC 170501140704)
- COOPER CROSSING SUBDIVISION, Parma: IDR10C0ZA, minor, term to 2027-02-09
- COOPER CROSSING SUBDIVISION, Parma: IDR10L012, term to 2022-07-05
- PARMA MUNICIPAL AIRPORT: LEASE PARCELS, Parma: IDR10L0BF
- PARMA WASTEWATER TREATMENT PLANT UPGRADE, Parma: IDR1002ZW, minor, term to 2022-02-15
- PARMA, CITY OF - PARMA WWTP, Parma: ID0021776, minor, term to 2009-04-30
- PHEASANT RUN, Parma: IDR10C13T, minor, term to 2027-02-09
- PINTAIL POND, Parma: IDR10C26R, minor, term to 2027-02-09
- QUAIL RIDGE, Parma: IDR10C0UD, minor, term to 2027-02-09
- RIVERSIDE INC, Parma: IDNOEJ10H
Identity
| Facility | COOPER CROSSING |
|---|---|
| Permittee | Eells Construction |
| NPDES ID | IDR10C26G |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | January 10, 2022 |
| Expires | February 9, 2027 |
| Address | Parma, ID 83660 |
| Receiving water | Sand Hollow Creek |
| Subwatershed | Lower Sand Hollow Creek (HUC 170501140704) |
NPDES IDR10C26G: effluent limits and exceedances
COOPER CROSSING (NPDES IDR10C26G): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES IDR10C26G: no pollutant row on file.
NPDES IDR10C26G: inspections, violations and enforcement
NPDES IDR10C26G (COOPER CROSSING): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES IDR10C26G
NPDES IDR10C26G: one email when its EPA record changes — $99/month.
Permits near NPDES IDR10C26G
NPDES IDR10C26G: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.