EPA · discharge permits by city
Discharge permits in Parma, Idaho
- 14Current permits
Every permit’s record in Parma
Each of the 14 current permits in Parma has a record page: every permit in Parma, A to Z.
Permits
Major dischargers first. Permits are placed by the address on the permit, which is the operation’s own, not the outfall’s.
| Permit holder | NPDES ID | Program | Discharger | Receiving water | Status and term |
|---|---|---|---|---|---|
| COOPER CROSSING | IDR10C26G | Construction stormwater | Minor | Sand Hollow Creek | Effective, 2022-01-10 to 2027-02-09 |
| COOPER CROSSING SUBDIVISION | IDR10C0ZA | Construction stormwater | Minor | Sand Hollow Creek | Effective, 2022-01-10 to 2027-02-09 |
| FLOC DISPOSAL | IDR10C1Q2 | Construction stormwater | Minor | Boise River | Effective, 2022-01-10 to 2027-02-09 |
| FORT BOISE WILDLIFE MANAGEMENT AREA | IDR10C1SC | Construction stormwater | Minor | Cherry Gulch and Buttermilk Slough | Effective, 2022-01-10 to 2027-02-09 |
| HEXON ROAD BRIDGE | IDR10C1F8 | Construction stormwater | Minor | Boise River | Effective, 2022-01-10 to 2027-02-09 |
| PARMA WASTEWATER TREATMENT PLANT UPGRADE | IDR1002ZW | Construction stormwater | Minor | Lower Sand Hollow Creek | Administratively continued, 2021-03-08 to 2022-02-15 |
| PARMA, CITY OF - PARMA WWTP | ID0021776 | Publicly owned treatment works | Minor | SAND HOLLOW CREEK TO BOISE RIVER | Administratively continued, 2004-02-27 to 2009-04-30 |
| PHEASANT RUN | IDR10C13T | Construction stormwater | Minor | Sand Hollow Creek: 1st & 2nd Order Tributaries | Effective, 2022-01-10 to 2027-02-09 |
| PINTAIL POND | IDR10C26R | Construction stormwater | Minor | Sand Hollow Creek | Effective, 2022-01-10 to 2027-02-09 |
| QUAIL RIDGE | IDR10C0UD | Construction stormwater | Minor | Sand Hollow Creek: 1st & 2nd Order Tributaries | Effective, 2022-01-10 to 2027-02-09 |
| COOPER CROSSING SUBDIVISION | IDR10L012 | Construction stormwater | Minor | Lower Sand Hollow Creek | Not needed, 2021-10-19 to 2022-07-05 |
| GAMBLE ISLAND BRIDGES | IDR1002OK | Construction stormwater | Minor | Ashlock Gulch-Snake River | Not needed |
| PARMA MUNICIPAL AIRPORT: LEASE PARCELS | IDR10L0BF | Construction stormwater | Minor | Lower Sand Hollow Creek | Not needed |
| RIVERSIDE INC | IDNOEJ10H | Industrial stormwater | Minor | Lower Sand Hollow Creek | Not needed |
Other cities in Idaho
- Near Grangeville 3
- Near Kooskia 4
- New Meadows 3
- New Plymouth 13
- Nezperce 3
- Nordman 3
- North Fork 5
- Oakley 3
- Oldtown 3
- Orofino 14
- Payette 9
- Peck 3
- Picabo 5
- Pierce 4
- Plummer 8
- Pocatello 91
- Ponderay 9
- Post Falls 47
- Preston 7
- Priest River 8
What this page shows
This page covers Clean Water Act discharge permits in the EPA NPDES register for PARMA. It lists 14 permits.