Clean Water Act discharge permit · NPDES MAR1004YM

HCP ANCHOR POINT PHASE II, Beverly, MA: NPDES MAR1004YM discharge permit, effluent exceedances, inspections, penalties

HCP ANCHOR POINT PHASE II, held by Windover Construction, Inc., holds NPDES permit MAR1004YM. EPA’s file records it issued December 25, 2023 and expiring February 16, 2027.

HCP ANCHOR POINT PHASE II, Beverly, Massachusetts: Coverage under a general permit MAR1004YM, held by Windover Construction, Inc.; Construction stormwater; Effective; issued December 25, 2023, term to February 16, 2027, by U.S. EPA.

Massachusetts holds 3,320 Construction stormwater coverages of this permit type in EPA’s file; 1,586 were issued before MAR1004YM. Windover Construction, Inc. holds 3 permits in Massachusetts.

Other permits held by Windover Construction, Inc.

Coverages issued nearest MAR1004YM

HCP ANCHOR POINT PHASE II among its neighbors

EPA’s permit file holds 112 discharge permits in the North River-Frontal Massachusetts Bay subwatershed (HUC 010900010302), MAR1004YM among them.

Other permits in the North River-Frontal Massachusetts Bay subwatershed (HUC 010900010302)

What the register holds for HCP ANCHOR POINT PHASE II: its NPDES ID, its permit type and status, its dates, its address in Beverly, Massachusetts. EPA’s effluent violation file and its single-event violation file hold no violation for NPDES MAR1004YM.

Identity

Facility as filedHCP ANCHOR POINT PHASE II
Permittee as filedWindover Construction, Inc.
NPDES IDMAR1004YM
Permit statusEffective
Permit typeCoverage under a general permit
Discharger classMinor discharger
Facility typeNot a publicly owned treatment works
ProgramConstruction stormwater
IssuedDecember 25, 2023
Expiration dateFebruary 16, 2027
Issuing agencyU.S. EPA
AddressBeverly, MA 01915
SubwatershedNorth River-Frontal Massachusetts Bay (HUC 010900010302)

Effluent limits and exceedances

EPA’s limits and effluent violation files hold no pollutant row for NPDES MAR1004YM.

Inspections, violations and enforcement

EPA’s single-event violation file, as loaded, holds no violation for NPDES MAR1004YM.

Inspections

EPA’s inspection file holds no inspection for NPDES MAR1004YM.

Formal enforcement and penalties

0 formal actions, 0 of them with a penalty assessed. Federal and state penalties are separate figures from separate authorities and are shown as each was filed, never added together.

Informal enforcement

EPA’s informal enforcement file holds no action for NPDES MAR1004YM.

Watch this permit

One permit holder, $99/month. Watch the register for one permit holder and the places and receiving waters tied to its permits. Choose “One permit holder” and enter this permit’s NPDES ID, MAR1004YM.

Start the watch

How often?
  • One permit holder — $99/month
  • One watershed — $2,990/year
  • One state — $4,990/year
  • The whole register — $18,000/year

How we handle your data → Privacy

Nearby on the register

Figures from EPA’s ICIS-NPDES download, loaded September 15, 2026.

What this page shows

HCP ANCHOR POINT PHASE II is one of 15 storm water construction permits in Beverly, Massachusetts, and 33.3% of those 15 permits carry an earlier issue date than this one. The permit sits within a subwatershed that holds 112 NPDES permits, and none of the 15 Beverly storm water construction permits has a violation on file, which is 0.0%.