Clean Water Act discharge permit · NPDES MTR108772

US 12 BANK STABILIZATION PHASE 2, Roundup, MT: NPDES MTR108772 discharge permit, effluent exceedances, inspections, penalties

US 12 BANK STABILIZATION PHASE 2, held by Montana Department of Transportation, holds NPDES permit MTR108772, which discharges to Musselshell River. EPA’s file records it issued February 16, 2021 and expiring December 31, 2022. The status and dates are as EPA’s permit file stood when Velarion loaded it (September 15, 2026); EPA’s free Detailed Facility Report on ECHO carries the permit’s current standing.

Identity

Facility as filedUS 12 BANK STABILIZATION PHASE 2
Permittee as filedMontana Department of Transportation
NPDES IDMTR108772
Permit statusEffective
Permit typeCoverage under a general permit
Discharger classMinor discharger
Facility typeNot a publicly owned treatment works
ProgramConstruction stormwater
IssuedFebruary 16, 2021
Expiration dateDecember 31, 2022
AddressRoundup, MT 59072
Receiving waterMUSSELSHELL RIVER
Receiving water impaired303(D) Listed
SubwatershedMusselshell River-Stag Run (HUC 100402012307)

Cited to the EPA ICIS-NPDES permit file (ECHO download).

Effluent limits and exceedances

EPA’s limits and effluent violation files hold no pollutant row for NPDES MTR108772.

Cited to the EPA ICIS-NPDES limits and effluent violations files (ECHO download); up to 60 rows shown, most exceedances first.

Inspections, violations and enforcement

DateWhat EPA recordedAgency
May 11, 2021WW Storm Water Construction - Failure to properly operate and maintain BMPsST6
May 11, 2021WW Storm Water Construction - Failure to properly install/implement BMPsST6
May 11, 2021WW Storm Water Construction - Failure to Conduct InspectionsST6

Velarion’s copy of EPA’s ICIS-NPDES files does not include the inspections, formal enforcement actions and informal enforcement actions files, so this page shows none of them. EPA’s free Detailed Facility Report on ECHO lists this permit’s inspections, enforcement actions and penalties.

Cited to the EPA ICIS-NPDES violation, inspection and enforcement files (ECHO download); up to 50 rows of each shown, newest first.

Watch this permit

One permit holder, $99/month. Watch the register for one permit holder and the places and receiving waters tied to its permits. Choose “One permit holder” and enter this permit’s NPDES ID, MTR108772.

Start the watch

How often?
  • One permit holder — $99/month
  • One watershed — $2,990/year
  • One state — $4,990/year
  • The whole register — $18,000/year

How we handle your data → Privacy

EPA publishes a free Detailed Facility Report for every permit on ECHO: its compliance status quarter by quarter, its inspections, and its enforcement actions and penalties. EPA also sends free notices of new inspections and enforcement actions through ECHO Notify; enter NPDES ID MTR108772 there.

Nearby on the register

Figures from EPA’s ICIS-NPDES download, loaded September 15, 2026.

What this page shows

This public-records page covers the Clean Water Act construction stormwater discharge permit NPDES MTR108772 for US 12 BANK STABILIZATION PHASE 2 in Roundup, MT, held by Montana Department of Transportation, with a status of Effective and an expiration date of December 31, 2022. The permit's file shows 0 pollutants on file, 0 under a numeric limit, and 0 with an effluent exceedance.