EPA · Texas · discharge permits by parameter
IC25 Low Flow Pass/Fail Lethal Static Renewal 7 Day Chronic Americamysis bahia (Mysidopsis bahia) in Texas
- 9Permits carrying a limit
- 0With a recorded exceedance
- 9Nationwide
A parameter is the substance or the property EPA writes a numeric limit for, and this page counts the Texas permits that carry one for IC25 Low Flow Pass/Fail Lethal Static Renewal 7 Day Chronic Americamysis bahia (Mysidopsis bahia): 9 permits, of which 0 have a recorded exceedance. Nationwide the same parameter appears in 9 permits. Each row below is one permit, and it opens the agency’s own record for that permit.
Permits
| Permit holder | NPDES ID | City | Program | Discharger | Receiving water |
|---|---|---|---|---|---|
| CHEVRON PHILLIPS CHEMICAL CEDAR BAYOU PLANT | TX0003948 | BAYTOWN | Major | CEDAR BAYU TIDAL | |
| BATTLEGROUND CHLOR ALKALI PLANT | TX0008150 | LA PORTE | Major | SEG 1005 SAN JACINTO RIVER BASIN | |
| CHEMOURS INGLESIDE PLANT | TX0008907 | GREGORY | Major | VIA PIP SUBMERGED OUTLET;OPEN CHANNEL;LA QUINTA CH | |
| CLINTON PARK WWTP | TX0035106 | HOUSTON | Publicly owned treatment works | Major | HOUSTON SHIP CHANNEL/BUFFALO BAYOU |
| DEER PARK PVC PLANT | TX0007412 | DEER PARK | Major | PATRICK BAYOU, HOUSTON SHIP CHANNEL | |
| LYNN BAYOU WWTF | TX0047562 | PORT LAVACA | Publicly owned treatment works | Major | LYNN BAYOU;LAVACA BAY/CHOCOLATE BAY |
| METRO CENTRAL WWTP | TX0069736 | HOUSTON | Publicly owned treatment works | Major | HORSEPEN BAYOU;ARMAND BAYOU |
| NORTHEAST WWTP | TX0063037 | HOUSTON | Publicly owned treatment works | Major | GREENS BAYOU TIDAL IN HSCT |
| WHITECAP WWTF | TX0047121 | CORPUS CHRISTI | Publicly owned treatment works | Major | LAGUNA MADRE |
Other pollutants in Texas
- Description of pathogen option used 1,820
- Vector attraction reduction alternative used 1,820
- Chloroethane 79
- Maintenance Waste: Do you have a BMP? 135
- Maintenance Waste: Are you using a BMP? 135
- Cooling Water Intake Velocity 20
- Cooling Water Baseline Study 18
- Cooling Water Entrainment Monitoring Study 18
- Cooling Water Intake Inspection 20
- IC25 Low Flow Pass/Fail Lethal Static Renewal 7 Day Chronic Ceriodaphnia dubia 57
- IC25 Low Flow Pass/Fail Lethal Static Renewal 7 Day Chronic Pimephales promelas 58
- IC25 Low Flow Pass/Fail Lethal Static Renewal 7 Day Chronic Menidia beryllina 9
- IC25 Low Flow Pass/Fail Sub-Lethal Static Renewal 7 Day Chronic Ceriodaphnia dubia 57
- IC25 Low Flow Pass/Fail Sub-Lethal Static Renewal 7 Day Chronic Americamysis bahia (M. bahia) 9
- IC25 Low Flow Pass/Fail Sub-Lethal Static Renewal 7 Day Chronic Pimephales promelas 58
- IC25 Low Flow Pass/Fail Sub-Lethal Static Renewal 7 Day Chronic Menidia beryllina 9
- IC25 Lethal Static Renewal 7 Day Chronic Ceriodaphnia dubia 57
- IC25 Lethal Static Renewal 7 Day Chronic Americamysis bahia (formerly Mysidopsis bahia) 9
- IC25 Lethal Static Renewal 7 Day Chronic Pimephales promelas 58
- IC25 Lethal Static Renewal 7 Day Chronic Menidia beryllina 9
The Pay Desk is the free weekly executive pay briefing — one company at a time, every number traceable to a public filing.You’ll confirm on The Pay Desk’s sign-up page.