Velarion Records
Follow this permit Velarion Records emails you this permit’s record, cited to the public filing, and tells you when the register changes it. Free.
We’ll email you a link to confirm. The continuous daily watch on every change is the paid alert. Unsubscribe any time.
Also free: The Pay Desk, the weekly executive pay briefing.

Clean Water Act discharge permit · NPDES TXR1502YP

THE BARRACKS PHASE 1, San Marcos, TX: NPDES TXR1502YP discharge permit, effluent exceedances, inspections, penalties

THE BARRACKS PHASE 1, held by Jl Gray Construction, LLC, holds NPDES permit TXR1502YP, which discharges to Lower San Marcos River. EPA’s file records it issued June 17, 2026 and expiring March 4, 2028. The status and dates are as EPA’s permit file stood when Velarion loaded it (October 14, 2026); EPA’s free Detailed Facility Report on ECHO carries the permit’s current standing.

What the register holds for THE BARRACKS PHASE 1: its NPDES ID, its permit type and status, its dates, its address in San Marcos, Texas, its receiving water. EPA’s effluent violation file and its single-event violation file hold no violation for NPDES TXR1502YP.

Identity

Facility as filedTHE BARRACKS PHASE 1
Permittee as filedJl Gray Construction, LLC
NPDES IDTXR1502YP
Permit statusEffective
Permit typeCoverage under a general permit
Discharger classMinor discharger
Facility typeNot a publicly owned treatment works
ProgramConstruction stormwater
IssuedJune 17, 2026
Expiration dateMarch 4, 2028
AddressSan Marcos, TX 78666
Receiving waterLOWER SAN MARCOS RIVER
SubwatershedRedwood Cemetery-Cottonwood Creek (HUC 121002030305)
SIC1521 – Single-Family Housing Construction

Cited to the EPA ICIS-NPDES permit file (ECHO download) and EPA’s NAICS/SIC and component files, the same download.

Effluent limits and exceedances

EPA’s limits and effluent violation files hold no pollutant row for NPDES TXR1502YP.

Cited to the EPA ICIS-NPDES limits and effluent violations files (ECHO download); up to 60 rows shown, most exceedances first.

Inspections, violations and enforcement

EPA’s single-event violation file, as loaded, holds no violation for NPDES TXR1502YP.

Velarion’s copy of EPA’s ICIS-NPDES files does not include the inspections, formal enforcement actions and informal enforcement actions files, so this page shows none of them. EPA’s free Detailed Facility Report on ECHO lists this permit’s inspections, enforcement actions and penalties.

Cited to the EPA ICIS-NPDES violation, inspection and enforcement files (ECHO download); up to 50 rows of each shown, newest first.

Watch this permit

One permit holder, $99/month. Watch the register for one permit holder and the places and receiving waters tied to its permits. Choose “One permit holder” and enter this permit’s NPDES ID, TXR1502YP.

Start the watch

How often?
  • One permit holder — $99/month
  • One watershed — $2,990/year
  • One state — $4,990/year
  • The whole register — $18,000/year

How we handle your data → Privacy

EPA publishes a free Detailed Facility Report for every permit on ECHO: its compliance status quarter by quarter, its inspections, and its enforcement actions and penalties. EPA also sends free notices of new inspections and enforcement actions through ECHO Notify; enter NPDES ID TXR1502YP there.

Nearby on the register

Figures from EPA’s ICIS-NPDES download, loaded October 14, 2026.

What this page shows

THE BARRACKS PHASE 1 is one of 41 NPDES permits in the Redwood Cemetery-Cottonwood Creek subwatershed. Of the 336 storm water construction permits in Hays County, 89.3% have an earlier issue date than this permit. The permit has no pollutants under a numeric limit and no pollutants with an effluent exceedance.