Clean Water Act discharge permit · NPDES TXR1523XM

SHECO - DEER SUBSTATION 138KV TRANSMISSION LINE, Woodville, TX: NPDES TXR1523XM discharge permit, effluent exceedances, inspections, penalties

SHECO - DEER SUBSTATION 138KV TRANSMISSION LINE, held by Sam Houston Electric Cooperative, Inc., holds NPDES permit TXR1523XM, which discharges to Woods Creek. EPA’s file records it issued February 27, 2026 and expiring March 4, 2028. The status and dates are as EPA’s permit file stood when Velarion loaded it (September 15, 2026); EPA’s free Detailed Facility Report on ECHO carries the permit’s current standing.

What the register holds for SHECO - DEER SUBSTATION 138KV TRANSMISSION LINE: its NPDES ID, its permit type and status, its dates, its address in Woodville, Texas, its receiving water. EPA’s effluent violation file and its single-event violation file hold no violation for NPDES TXR1523XM.

Identity

Facility as filedSHECO - DEER SUBSTATION 138KV TRANSMISSION LINE
Permittee as filedSam Houston Electric Cooperative, Inc.
NPDES IDTXR1523XM
Permit statusEffective
Permit typeCoverage under a general permit
Discharger classMinor discharger
Facility typeNot a publicly owned treatment works
ProgramConstruction stormwater
IssuedFebruary 27, 2026
Expiration dateMarch 4, 2028
AddressWoodville, TX 75979
Receiving waterWOODS CREEK
SubwatershedMill Creek-Bear Creek (HUC 120200060102)

Cited to the EPA ICIS-NPDES permit file (ECHO download).

Effluent limits and exceedances

EPA’s limits and effluent violation files hold no pollutant row for NPDES TXR1523XM.

Cited to the EPA ICIS-NPDES limits and effluent violations files (ECHO download); up to 60 rows shown, most exceedances first.

Inspections, violations and enforcement

EPA’s single-event violation file, as loaded, holds no violation for NPDES TXR1523XM.

Velarion’s copy of EPA’s ICIS-NPDES files does not include the inspections, formal enforcement actions and informal enforcement actions files, so this page shows none of them. EPA’s free Detailed Facility Report on ECHO lists this permit’s inspections, enforcement actions and penalties.

Cited to the EPA ICIS-NPDES violation, inspection and enforcement files (ECHO download); up to 50 rows of each shown, newest first.

Watch this permit

One permit holder, $99/month. Watch the register for one permit holder and the places and receiving waters tied to its permits. Choose “One permit holder” and enter this permit’s NPDES ID, TXR1523XM.

Start the watch

How often?
  • One permit holder — $99/month
  • One watershed — $2,990/year
  • One state — $4,990/year
  • The whole register — $18,000/year

How we handle your data → Privacy

EPA publishes a free Detailed Facility Report for every permit on ECHO: its compliance status quarter by quarter, its inspections, and its enforcement actions and penalties. EPA also sends free notices of new inspections and enforcement actions through ECHO Notify; enter NPDES ID TXR1523XM there.

Nearby on the register

Figures from EPA’s ICIS-NPDES download, loaded September 15, 2026.

What this page shows

SHECO - DEER SUBSTATION 138KV TRANSMISSION LINE is the only storm water construction permit on EPA's NPDES register in the Mill Creek-Bear Creek subwatershed. Of the 12 storm water construction permits in Tyler County, 75.0% have an earlier issue date than this permit, and 0.0% have a violation on file.