Clean Water Act discharge permit · NPDES TXR1541XP
CH TO HURLWOOD, Lubbock, TX: NPDES TXR1541XP discharge permit, effluent exceedances, inspections, penalties
- EffectivePermit status
- MinorDischarger class
- 0Pollutants under a numeric limit
- 0Pollutants with an effluent exceedance
- 0Inspections on file
- 0Formal enforcement actions
CH TO HURLWOOD, held by Driver Pipeline Company, Inc., holds NPDES permit TXR1541XP, which discharges to 1241a North Fork Double Mountain Fork Brazos River. EPA’s file records it issued March 11, 2026 and expiring March 4, 2028.
CH TO HURLWOOD, Lubbock, Texas: Coverage under a general permit TXR1541XP, held by Driver Pipeline Company, Inc.; Construction stormwater; Effective; issued March 11, 2026, term to March 4, 2028; discharges to 1241A NORTH FORK DOUBLE MOUNTAIN FORK BRAZOS RIVER.
Texas holds 23,986 Construction stormwater coverages of this permit type in EPA’s file; 19,526 were issued before TXR1541XP. Driver Pipeline Company, Inc. holds 8 permits in Texas.
Other permits held by Driver Pipeline Company, Inc.
- 7005 S COOPER ST 4 IN MAIN FORTIFICATION & INST, Arlington: TXR1508ME, issued March 20, 2023
- IH-35E PH2 UAAA2 RELOC PROJ, Farmesrs Branch: TXR1553NR, issued July 21, 2023
- CTR JEFFERSON MAIN EXT, Dallas: TXR1564VO, issued August 18, 2025
- TXDOT US 377 W W5 AND W5 LOOPRELOCATION, Argyle: TXR1566VR, issued August 28, 2025
- CANYONS FORTIFICATION, Keene: TXR1569VR, issued August 28, 2025
- IH-35 MERGE PIPELINE RELOCATION PROJECT, Denton: TXR1570OR, issued October 16, 2023
- 107TH STREET RELOCATION, Arlington: TXR1592UC, issued March 31, 2025
Coverages issued nearest TXR1541XP
- March 11, 2026: QUALITY CUSTOM HOME DEVELOPMENT, Odessa, TXR1536XP, held by Quality Custom Home Development, LLC
- March 11, 2026: ADALINE WOODS, Magnolia, TXR1537XP, held by Dempseygill, Llc
- March 11, 2026: LAS MANADAS INDUSTRIAL PARK PHASE 1, Laredo, TXR1538XP, held by Mtz Construction, Inc.
- March 11, 2026: PECAN CREEK WATER RECLAMATION PLANT, Denton, TXR1539XP, held by Sundt Construction, Inc.
- March 11, 2026: TXDOT ODA 1188-02-111 MIDLAND COUNTY, Midland, TXR1540XP, held by Jones Bros. Dirt & Paving Contractors, Inc.
- March 11, 2026: TXDOT ODA 0354-04-044 WINKLER COUNTY, Kermit, TXR1542XP, held by Jones Bros. Dirt & Paving Contractors, Inc.
- March 11, 2026: CIPHER MINING BLACK PEARL PROJECT, Wink, TXR1543XP, held by Northstar Energy Services, Inc.
- March 11, 2026: SAND DOLLAR, Corpus Christi, TXR1544XP, held by Guerra Underground LLC
- March 11, 2026: I-20 PHASE 2, Dallas, TXR1545XP, held by Bob Moore Construction, Inc.
- March 11, 2026: VALLEY RIDGE, Lewisville, TXR1546XP, held by Bob Moore Construction, Inc.
CH TO HURLWOOD among its neighbors
Its county holds 577, 2 of them major permits; TXR1541XP is a minor permit.
Other permits in the county
- 146TH AND FRANKFORD, Lubbock: TXR1529OK, minor permit, discharging to PLAYA LAKE 188, permit term to March 4, 2028
- 146TH ST RECONSTRUCTION FROM QUAKER TO INDIANA, Lubbock: TXR1513RQ, minor permit, discharging to NONE, permit term to March 4, 2028
- 15005 CANTON AVE LUBBOCK TX 79423, Lubbock: TXR1551VZ, minor permit, discharging to 409, permit term to March 4, 2028
- 19TH AND MACKEY, Lubbock: TXR1545TM, minor permit, discharging to PLAYA LAKE 144, permit term to March 4, 2028
- 2901 151ST, Lubbock: TXR1505VW, minor permit, discharging to 409, permit term to March 4, 2028
- 34TH STREET RECONSTRUCTION UPLAND AVENUE TO MILWAUKEE AVENUE, Lubbock: TXR1528WU, minor permit, discharging to NORTH FORK BRAZOS RIVER, permit term to March 4, 2028
- 48FORTY LUBBOCK, Lubbock: TXR05GB31, minor permit, permit term to August 13, 2026
- 66TH STREET CHANNEL DRAINAGE IMPROVEMENTS, Lubbock: TXR1555SH, minor permit, discharging to PLAYA LAKE 39A, permit term to March 4, 2028
- 66TH STREET FROM I-27 TO ASH AVENUE, Lubbock: TXR1512UY, minor permit, discharging to NORTH FORK BRAZOS RIVER, permit term to March 4, 2028
- 6814 50TH, Lubbock: TXR1540RR, minor permit, discharging to PLAYA LAKE 39, permit term to March 4, 2028
What the register holds for CH TO HURLWOOD: its NPDES ID, its permit type and status, its dates, its address in Lubbock, Texas, its receiving water. EPA’s effluent violation file and its single-event violation file hold no violation for NPDES TXR1541XP.
Identity
| Facility as filed | CH TO HURLWOOD |
|---|---|
| Permittee as filed | Driver Pipeline Company, Inc. |
| NPDES ID | TXR1541XP |
| Permit status | Effective |
| Permit type | Coverage under a general permit |
| Discharger class | Minor discharger |
| Facility type | Not a publicly owned treatment works |
| Program | Construction stormwater |
| Issued | March 11, 2026 |
| Expiration date | March 4, 2028 |
| Address | Lubbock, TX 76407 |
| Receiving water | 1241A NORTH FORK DOUBLE MOUNTAIN FORK BRAZOS RIVER |
Effluent limits and exceedances
- 0Pollutants on file
- 0Under a numeric limit
- 0With a violation of any kind
- 0With an effluent exceedance
EPA’s limits and effluent violation files hold no pollutant row for NPDES TXR1541XP.
Inspections, violations and enforcement
- 0Single-event violations
EPA’s single-event violation file, as loaded, holds no violation for NPDES TXR1541XP.
Inspections
EPA’s inspection file holds no inspection for NPDES TXR1541XP.
Formal enforcement and penalties
0 formal actions, 0 of them with a penalty assessed. Federal and state penalties are separate figures from separate authorities and are shown as each was filed, never added together.
Informal enforcement
EPA’s informal enforcement file holds no action for NPDES TXR1541XP.
Watch this permit
One permit holder, $99/month. Watch the register for one permit holder and the places and receiving waters tied to its permits. Choose “One permit holder” and enter this permit’s NPDES ID, TXR1541XP.
Start the watch
- One permit holder — $99/month
- One watershed — $2,990/year
- One state — $4,990/year
- The whole register — $18,000/year
How we handle your data → Privacy
Nearby on the register
- Discharge permits in Lubbock
- Every permit record in Lubbock, A to Z
- Discharge permits in Texas
- Every permit record in Texas, A to Z
Figures from EPA’s ICIS-NPDES download, loaded September 15, 2026.