Clean Water Act discharge permit · NPDES TXR1552WT
UPCI - TEXAS DIVISION, Lufkin, TX: NPDES TXR1552WT discharge permit, effluent exceedances, inspections, penalties
- EffectivePermit status
- MinorDischarger class
- 0Pollutants under a numeric limit
- 0Pollutants with an effluent exceedance
- 0Inspections on file
- 0Formal enforcement actions
UPCI - TEXAS DIVISION, held by Angelina Excavating, INC., holds NPDES permit TXR1552WT, which discharges to Hurricane Creek Segment 0604b. EPA’s file records it issued December 16, 2025 and expiring March 4, 2028.
UPCI - TEXAS DIVISION, Lufkin, Texas: Coverage under a general permit TXR1552WT, held by Angelina Excavating, INC.; Construction stormwater; Effective; issued December 16, 2025, term to March 4, 2028; discharges to HURRICANE CREEK SEGMENT 0604B.
Texas holds 23,986 Construction stormwater coverages of this permit type in EPA’s file; 17,666 were issued before TXR1552WT. Angelina Excavating, INC. holds 3 permits in Texas.
Other permits held by Angelina Excavating, INC.
- BROOKSHIRE BROTHERS 118, Lufkin: TXR1556PO, issued January 16, 2024
- DIBOLL PILOT, Diboll: TXR1596ZH, issued September 1, 2026
Coverages issued nearest TXR1552WT
- December 16, 2025: ROCK CREEK 2A, Fort Worth, TXR1546WT, held by Atmos Energy Corporation
- December 16, 2025: ROCK CREEK 2A, Fort Worth, TXR1547WT, held by Pci Utilities, LLC
- December 16, 2025: PILGRIMS REC TO QUITMAN, Alba, TXR1549WT, held by Southwestern Electric Power Company
- December 16, 2025: GRAND SALINE - PILGRIMS REC, Grand Saline, TXR1550WT, held by Southwestern Electric Power Company
- December 16, 2025: YEGUA LANDING SUBDIVISION, Somerville, TXR1551WT, held by Cervantez Construction, LLC
- December 16, 2025: TEXAS TECH CREDIT UNION, Lubbock, TXR1553WT, held by Allen Teinert Construction Company Assumed Name Teinert Construction
- December 16, 2025: AMAVI NORTHWEST AUSTIN, Austin, TXR1554WT, held by DNT Construction, LLC
- December 16, 2025: COE RANCH, Magnolia, TXR1555WT, held by Tmw Land Services
- December 16, 2025: RESIDENCES AT THE LANDING PHASE 2, Kerrville, TXR1556WT, held by Macdonald Companies, Inc.
- December 16, 2025: AQUA WSC OPERATIONS CENTER, Bastrop, TXR1557WT, held by Raymond Construction Co., Inc.
UPCI - TEXAS DIVISION among its neighbors
EPA’s permit file holds 30 discharge permits in the Zed Creek-Cedar Creek subwatershed (HUC 120200020302), TXR1552WT among them. Its county holds 74, 3 of them major permits; TXR1552WT is a minor permit.
Other permits in the Zed Creek-Cedar Creek subwatershed (HUC 120200020302)
- ATKINSON CANDY, Lufkin: TXRNECB57, minor permit, permit term to August 13, 2026
- BROOKSHIRE BROTHERS 118, Lufkin: TXR1556PO, minor permit, discharging to HURRICANE CREEK 0604B, permit term to March 4, 2028
- CEDAR CREEK ESTATES, Lufkin: TXR1589QK, minor permit, discharging to NECHES RIVER, permit term to March 4, 2028
- CFA - LUFKIN RELO S LOOP CROSSING TX 6139, Lufkin: TXR1539YT, minor permit, discharging to UNNAMED TRIBUTARY, permit term to March 4, 2028
- CITY OF LUFKIN - MORRIS FRANK PARK BUILDING C, Lufkin: TXR1519UA, minor permit, discharging to CEDAR CREEK, permit term to March 4, 2028
- CONTRACTORS SUPPLIES LUFKIN PLANT, Lufkin: TXG110196, minor permit, discharging to CEDAR CREEK, permit term to November 7, 2021
- COOPER POWER SYSTEMS, Lufkin: TXRNEBO07, minor permit, permit term to August 13, 2026
- COOPER POWER SYSTEMS, Lufkin: TXRNECB62, minor permit, permit term to August 13, 2026
- DREAM HOMES & DRAFTING, Lufkin: TXR1576ND, minor permit, discharging to CEDAR CREEK, permit term to March 4, 2028
- GEORGIA-PACIFIC CHEMICALS LUFKIN PLANT, Lufkin: TX0082261, minor permit, discharging to UNNAMED DITCH, permit term to August 1, 2016
What the register holds for UPCI - TEXAS DIVISION: its NPDES ID, its permit type and status, its dates, its address in Lufkin, Texas, its receiving water. EPA’s effluent violation file and its single-event violation file hold no violation for NPDES TXR1552WT.
Identity
| Facility as filed | UPCI - TEXAS DIVISION |
|---|---|
| Permittee as filed | Angelina Excavating, INC. |
| NPDES ID | TXR1552WT |
| Permit status | Effective |
| Permit type | Coverage under a general permit |
| Discharger class | Minor discharger |
| Facility type | Not a publicly owned treatment works |
| Program | Construction stormwater |
| Issued | December 16, 2025 |
| Expiration date | March 4, 2028 |
| Address | Lufkin, TX 75901 |
| Receiving water | HURRICANE CREEK SEGMENT 0604B |
| Subwatershed | Zed Creek-Cedar Creek (HUC 120200020302) |
Effluent limits and exceedances
- 0Pollutants on file
- 0Under a numeric limit
- 0With a violation of any kind
- 0With an effluent exceedance
EPA’s limits and effluent violation files hold no pollutant row for NPDES TXR1552WT.
Inspections, violations and enforcement
- 0Single-event violations
EPA’s single-event violation file, as loaded, holds no violation for NPDES TXR1552WT.
Inspections
EPA’s inspection file holds no inspection for NPDES TXR1552WT.
Formal enforcement and penalties
0 formal actions, 0 of them with a penalty assessed. Federal and state penalties are separate figures from separate authorities and are shown as each was filed, never added together.
Informal enforcement
EPA’s informal enforcement file holds no action for NPDES TXR1552WT.
Watch this permit
One permit holder, $99/month. Watch the register for one permit holder and the places and receiving waters tied to its permits. Choose “One permit holder” and enter this permit’s NPDES ID, TXR1552WT.
Start the watch
- One permit holder — $99/month
- One watershed — $2,990/year
- One state — $4,990/year
- The whole register — $18,000/year
How we handle your data → Privacy
Nearby on the register
- Discharge permits in Lufkin
- Every permit record in Lufkin, A to Z
- Discharge permits in Texas
- Every permit record in Texas, A to Z
Figures from EPA’s ICIS-NPDES download, loaded September 15, 2026.