Clean Water Act discharge permit · NPDES TXR1566CB
BRAZORIA COUNTY 20-12 OYSTER CREEK DESNAGGING PROJ, Angleton, TX: NPDES TXR1566CB discharge permit, effluent exceedances, inspections, penalties
- Administratively continuedPermit status
- MinorDischarger class
- 0Pollutants under a numeric limit
- 0Pollutants with an effluent exceedance
- 0Inspections on file
- 0Formal enforcement actions
BRAZORIA COUNTY 20-12 OYSTER CREEK DESNAGGING PROJ, held by Aftermath Disaster Recovery Inc, holds NPDES permit TXR1566CB, which discharges to Oyster Creek Above Tidal. EPA’s file records it issued May 1, 2020 and expiring March 4, 2023.
BRAZORIA COUNTY 20-12 OYSTER CREEK DESNAGGING PROJ, Angleton, Texas: Coverage under a general permit TXR1566CB, held by Aftermath Disaster Recovery Inc; Construction stormwater; Administratively continued (past its expiration date and still in force until reissued); issued May 1, 2020, term to March 4, 2023; discharges to OYSTER CREEK ABOVE TIDAL.
Texas holds 23,986 Construction stormwater coverages of this permit type in EPA’s file; 372 were issued before TXR1566CB. Aftermath Disaster Recovery Inc holds 2 permits in Texas.
Other permits held by Aftermath Disaster Recovery Inc
- BRAZORIA COUNTY 20-12 BASTROP BAYOU DESNAGGING PRO, Angleton: TXR1565CB, issued May 1, 2020
Coverages issued nearest TXR1566CB
- May 1, 2020: EXXON MOBIL CORPORATION NORTH HOUSTON TERMINAL MCC BUILDING, Houston, TXR1557CB, held by ExxonMobil Pipeline Company
- May 1, 2020: CITY OF KYLE WWTP EXPANSION, Kyle, TXR1561CB, held by ARCHER WESTERN CONSTRUCTION, LLC
- May 1, 2020: SANDIA RIDGE AT LEGENDS, Kingsland, TXR1563CB, held by LOCKHART EXCAVATION LLC
- May 1, 2020: WATER PLANT NO 2 ELEVATED STORAGE, Cypress, TXR1564CB, held by Delta West Environmental Company
- May 1, 2020: BRAZORIA COUNTY 20-12 BASTROP BAYOU DESNAGGING PRO, Angleton, TXR1565CB, held by Aftermath Disaster Recovery Inc
- May 1, 2020: JCISD 2018 BOND PROJECT ES MS ADMIN IMPROVEMENT, Johnson City, TXR1569CB, held by Stoddard Construction Management Inc.
- May 20, 2020: COSA-THOUSAND OAKS DRIVE (WETMORE RD. TO PERRIN BEITEL RD., San Antonio, TXR10F8B8, held by City of San Antonio
- June 1, 2020: CE KING HIGH SCHOOL TO MIDDLE SCHOOL CONVERSION, Houston, TXR1537CH, held by Nash Industries, Inc.
- June 1, 2020: CCCC CELINA CAMPUS SANITARY SEWER, Celina, TXR1538CH, held by Ana Site Constuction, LLC
- June 1, 2020: BLANCO ROAD PHASE II, San Antonio, TXR1541CH, held by ALAMO REGIONAL MOBILITY AUTHORITY
BRAZORIA COUNTY 20-12 OYSTER CREEK DESNAGGING PROJ among its neighbors
EPA’s permit file holds 130 discharge permits in the Lower Oyster Creek subwatershed (HUC 120402050400), TXR1566CB among them.
Other permits in the Lower Oyster Creek subwatershed (HUC 120402050400)
- 32010 AMBERJACK DR, Richwood: TXR1506NA, minor permit, discharging to BASTROP BAYOU TIDAL, permit term to March 4, 2028
- 3M ANGLETON, Angleton: TXRNEBP38, minor permit, permit term to August 13, 2026
- ABIGAIL ARIAS PARK, Angleton: TXR1531XY, minor permit, discharging to BASTROP BAYOU, permit term to March 4, 2028
- AIR LIQUIDE FREEPORT ASU, Freeport: TX0065021, minor permit, discharging to EAST UNION BAYOU;INTRACOASTAL CANAL, permit term to October 29, 2024
- ALAMO CONCRETE PRODUCTS PLANT #106, Freeport: TXG111438, minor permit, discharging to DOW BARGE CANAL, permit term to November 7, 2021
- AMBER RIDGE APARTMENTS, Angleton: TXR1564QE, minor permit, discharging to UNNAMED TRIBUTARY BASTROP CREEK, permit term to March 4, 2028
- ANGLE ACRES WWTP, Rosharon: TX0088366, minor permit, discharging to UNNAMED DITCH, BASTROP BAYOU TIDAL, permit term to September 1, 2018
- ANGLE ACRES WWTP, Angleton: TX0146323, not classed
- ANGLE ACRES WWTP, Angleton: TX0147044, not classed
- ANGLETON DRAINAGE DISTRICT MS4, Angleton: TXR040137, minor permit, discharging to OYSTER CREEK ABOVE TIDAL, permit term to January 23, 2024
What the register holds for BRAZORIA COUNTY 20-12 OYSTER CREEK DESNAGGING PROJ: its NPDES ID, its permit type and status, its dates, its address in Angleton, Texas, its receiving water. EPA’s effluent violation file and its single-event violation file hold no violation for NPDES TXR1566CB.
Identity
| Facility as filed | BRAZORIA COUNTY 20-12 OYSTER CREEK DESNAGGING PROJ |
|---|---|
| Permittee as filed | Aftermath Disaster Recovery Inc |
| NPDES ID | TXR1566CB |
| Permit status | Administratively continued (past its expiration date and still in force until reissued) |
| Permit type | Coverage under a general permit |
| Discharger class | Minor discharger |
| Facility type | Not a publicly owned treatment works |
| Program | Construction stormwater |
| Issued | May 1, 2020 |
| Expiration date | March 4, 2023 |
| Address | Angleton, TX 77515 |
| Receiving water | OYSTER CREEK ABOVE TIDAL |
| Subwatershed | Lower Oyster Creek (HUC 120402050400) |
| SIC | 1629 – Heavy Construction |
Effluent limits and exceedances
- 0Pollutants on file
- 0Under a numeric limit
- 0With a violation of any kind
- 0With an effluent exceedance
EPA’s limits and effluent violation files hold no pollutant row for NPDES TXR1566CB.
Inspections, violations and enforcement
- 0Single-event violations
EPA’s single-event violation file, as loaded, holds no violation for NPDES TXR1566CB.
Inspections
EPA’s inspection file holds no inspection for NPDES TXR1566CB.
Formal enforcement and penalties
0 formal actions, 0 of them with a penalty assessed. Federal and state penalties are separate figures from separate authorities and are shown as each was filed, never added together.
Informal enforcement
EPA’s informal enforcement file holds no action for NPDES TXR1566CB.
Watch this permit
One permit holder, $99/month. Watch the register for one permit holder and the places and receiving waters tied to its permits. Choose “One permit holder” and enter this permit’s NPDES ID, TXR1566CB.
Start the watch
- One permit holder — $99/month
- One watershed — $2,990/year
- One state — $4,990/year
- The whole register — $18,000/year
How we handle your data → Privacy
Nearby on the register
- Discharge permits in Angleton
- Every permit record in Angleton, A to Z
- Discharge permits in Texas
- Every permit record in Texas, A to Z
Figures from EPA’s ICIS-NPDES download, loaded October 14, 2026.