Clean Water Act discharge permit · NPDES TXR1570YY
ABILENE NW TO MULBERRY CREEK, Abilene, TX: NPDES TXR1570YY discharge permit, effluent exceedances, inspections, penalties
- EffectivePermit status
- MinorDischarger class
- 0Pollutants under a numeric limit
- 0Pollutants with an effluent exceedance
- 0Inspections on file
- 0Formal enforcement actions
ABILENE NW TO MULBERRY CREEK, held by AEP Texas Inc., holds NPDES permit TXR1570YY, which discharges to Clear Fork Brazos River. EPA’s file records it issued July 27, 2026 and expiring March 4, 2028.
ABILENE NW TO MULBERRY CREEK, Abilene, Texas: Coverage under a general permit TXR1570YY, held by AEP Texas Inc.; Construction stormwater; Effective; issued July 27, 2026, term to March 4, 2028; discharges to CLEAR FORK BRAZOS RIVER.
Texas holds 23,986 Construction stormwater coverages of this permit type in EPA’s file; 22,826 were issued before TXR1570YY. AEP Texas Inc. holds 50 permits in Texas.
Other permits held by AEP Texas Inc.
- LYTLE SUBSTATION, Natalia: TXR1503VP, issued August 19, 2025
- AEP CRUCE TO REFORZAR TRANSMISSION LINE CONSTRUCT, Falfurrias: TXR1504VH, issued July 21, 2025
- REFORZAR SUBSTATION CONSTRUCTION, Falfurrias: TXR1507PJ, issued December 19, 2023
- OKLAUNION PSO SUBSTATION PROJECT, Oklaunion: TXR1507QQ, issued April 22, 2024
- TANGO TO PAWNEE 345KV T-LINE REBUILD, Mineral: TXR1509XG, issued February 6, 2026
- ZOISITE SUBSTATION AND LAYDOWN YARD, Palacios: TXR1509YI, issued May 20, 2026
- HECKER TO RESNIK T-LINE REBUILD PROJECT, Gregory: TXR1510YT, issued July 2, 2026
- DACOSTA TO CANGREJO T-LINE REBUILD PROJECT, Dacosta: TXR1514WO, issued November 24, 2025
- AEP - CRUCE TO CENIZO TRANSMISSION LINE CONSTRUCT, Hebbronville: TXR1520VH, issued July 21, 2025
- AEP GOHLKE TO JOSLIN TRANSMISSION LINE REBUILD, Point Comfort: TXR1520XQ, issued March 13, 2026
Coverages issued nearest TXR1570YY
- July 27, 2026: 1821 JUBILEE LANE, Southlake, TXR1565YY, held by Calais Custom Homes, LLC
- July 27, 2026: EDWARD JONES BUILDING, Copperas Cove, TXR1566YY, held by Dmd Construction LLC
- July 27, 2026: CLARENDON TO GREENBELT, Clarendon, TXR1567YY, held by AEP Texas Inc.
- July 27, 2026: MAJESTIC SANDS UNIT ONE, El Paso, TXR1568YY, held by Tri-State Ventures DBA Carefree Homes
- July 27, 2026: WACO GATEWAY, Waco, TXR1569YY, held by LOCKHART EXCAVATION LLC
- July 27, 2026: QTS FTW1 DC1 EXPANSION 18MW, Fort Worth, TXR1571YY, held by AP Gulf States, Inc.
- July 27, 2026: CROSS CREEK WEST - HOME BUILDING, Fulshear, TXR1572YY, held by Dfh Coventry, LLC
- July 27, 2026: SANTA FE PARK, Lubbock, TXR1573YY, held by Arco National Holdings, Inc.
- July 27, 2026: PINE RANCH, Lindale, TXR1574YY, held by Pine Ranch Land Investors LLC
- July 27, 2026: 2121-06-062 HUDSPETH SAFETY REST AREA, Fort Hancock, TXR1575YY, held by Ragle, Inc.
ABILENE NW TO MULBERRY CREEK among its neighbors
EPA’s permit file holds 8 discharge permits in the Lower Mulberry Creek subwatershed (HUC 120601020505), TXR1570YY among them. Its county holds 191, 1 of them major permits; TXR1570YY is a minor permit.
Other permits in the Lower Mulberry Creek subwatershed (HUC 120601020505)
- ABILENE ENVIRONMENTAL LANDFILL, Abilene: TXR05FI78, minor permit, permit term to August 13, 2026
- AEP MULBERRY CREEK SUBSTATION, Abilene: TXR1505OI, minor permit, discharging to CLEAR FORK BRAZOS RIVER, permit term to March 4, 2028
- AEP MULBERRY CREEK SUBSTATION, Abilene: TXR1594UY, minor permit, discharging to UNNAMED EPHEMERAL STREAMS, permit term to March 4, 2028
- CRUSOE ENERGY WA CONNECT, Abilene: TXR1596UI, minor permit, discharging to ELM CREEK, permit term to March 4, 2028
- DOG STAR SOLAR ITC, Tye: TXR1541YR, minor permit, discharging to MULBERRY CREEK, permit term to March 4, 2028
- LANCIUM ABIPK, Abilene: TXR1566RP, minor permit, discharging to ELM CREEK, permit term to March 4, 2028
- MULTIPLE LOTS IN PLAINVIEW ESTATES SUBDIVISION, Hawley: TXR1557IP, minor permit, discharging to MULBERRY CREEK, permit term to March 4, 2023
What the register holds for ABILENE NW TO MULBERRY CREEK: its NPDES ID, its permit type and status, its dates, its address in Abilene, Texas, its receiving water. EPA’s effluent violation file and its single-event violation file hold no violation for NPDES TXR1570YY.
Identity
| Facility as filed | ABILENE NW TO MULBERRY CREEK |
|---|---|
| Permittee as filed | AEP Texas Inc. |
| NPDES ID | TXR1570YY |
| Permit status | Effective |
| Permit type | Coverage under a general permit |
| Discharger class | Minor discharger |
| Facility type | Not a publicly owned treatment works |
| Program | Construction stormwater |
| Issued | July 27, 2026 |
| Expiration date | March 4, 2028 |
| Address | Abilene, TX 79601 |
| Receiving water | CLEAR FORK BRAZOS RIVER |
| Subwatershed | Lower Mulberry Creek (HUC 120601020505) |
Effluent limits and exceedances
- 0Pollutants on file
- 0Under a numeric limit
- 0With a violation of any kind
- 0With an effluent exceedance
EPA’s limits and effluent violation files hold no pollutant row for NPDES TXR1570YY.
Inspections, violations and enforcement
- 0Single-event violations
EPA’s single-event violation file, as loaded, holds no violation for NPDES TXR1570YY.
Inspections
EPA’s inspection file holds no inspection for NPDES TXR1570YY.
Formal enforcement and penalties
0 formal actions, 0 of them with a penalty assessed. Federal and state penalties are separate figures from separate authorities and are shown as each was filed, never added together.
Informal enforcement
EPA’s informal enforcement file holds no action for NPDES TXR1570YY.
Watch this permit
One permit holder, $99/month. Watch the register for one permit holder and the places and receiving waters tied to its permits. Choose “One permit holder” and enter this permit’s NPDES ID, TXR1570YY.
Start the watch
- One permit holder — $99/month
- One watershed — $2,990/year
- One state — $4,990/year
- The whole register — $18,000/year
How we handle your data → Privacy
Nearby on the register
- Discharge permits in Abilene
- Every permit record in Abilene, A to Z
- Discharge permits in Texas
- Every permit record in Texas, A to Z
Figures from EPA’s ICIS-NPDES download, loaded September 15, 2026.