Clean Water Act discharge permit · NPDES VAR10N325

MAIN POINT SUBSTATION FINAL SITE AND GRADING PLAN, Fort Lee, VA: NPDES VAR10N325 discharge permit, effluent exceedances, inspections, penalties

MAIN POINT SUBSTATION FINAL SITE AND GRADING PLAN, held by Virginia Electric and Power Co dba Dominion Energy, holds NPDES permit VAR10N325, which discharges to James River-Bailey Creek. EPA’s file records it issued July 1, 2019 and expiring June 30, 2024.

MAIN POINT SUBSTATION FINAL SITE AND GRADING PLAN, Fort Lee, Virginia: Coverage under a general permit VAR10N325, held by Virginia Electric and Power Co dba Dominion Energy; Construction stormwater; Administratively continued (past its expiration date and still in force until reissued); issued July 1, 2019, term to June 30, 2024, by VA DEQ; discharges to James River-Bailey Creek.

Virginia holds 6,257 Construction stormwater coverages of this permit type in EPA’s file; 4 were issued before VAR10N325. Virginia Electric and Power Co dba Dominion Energy holds 26 permits in Virginia.

Other permits held by Virginia Electric and Power Co dba Dominion Energy

Coverages issued nearest VAR10N325

MAIN POINT SUBSTATION FINAL SITE AND GRADING PLAN among its neighbors

EPA’s permit file holds 44 discharge permits in the Bailey Creek-James River subwatershed (HUC 020802060201), VAR10N325 among them.

Other permits in the Bailey Creek-James River subwatershed (HUC 020802060201)

What the register holds for MAIN POINT SUBSTATION FINAL SITE AND GRADING PLAN: its NPDES ID, its permit type and status, its dates, its address in Fort Lee, Virginia, its receiving water. EPA’s effluent violation file and its single-event violation file hold no violation for NPDES VAR10N325.

Identity

Facility as filedMAIN POINT SUBSTATION FINAL SITE AND GRADING PLAN
Permittee as filedVirginia Electric and Power Co dba Dominion Energy
NPDES IDVAR10N325
Permit statusAdministratively continued (past its expiration date and still in force until reissued)
Permit typeCoverage under a general permit
Discharger classMinor discharger
Facility typeNot a publicly owned treatment works
ProgramConstruction stormwater
IssuedJuly 1, 2019
Expiration dateJune 30, 2024
Issuing agencyVA DEQ
AddressFort Lee, VA 23801
Receiving waterJames River-Bailey Creek
Receiving water impaired303(D) Listed
SubwatershedBailey Creek-James River (HUC 020802060201)

Effluent limits and exceedances

EPA’s limits and effluent violation files hold no pollutant row for NPDES VAR10N325.

Inspections, violations and enforcement

EPA’s single-event violation file, as loaded, holds no violation for NPDES VAR10N325.

Inspections

EPA’s inspection file holds no inspection for NPDES VAR10N325.

Formal enforcement and penalties

0 formal actions, 0 of them with a penalty assessed. Federal and state penalties are separate figures from separate authorities and are shown as each was filed, never added together.

Informal enforcement

EPA’s informal enforcement file holds no action for NPDES VAR10N325.

Watch this permit

One permit holder, $99/month. Watch the register for one permit holder and the places and receiving waters tied to its permits. Choose “One permit holder” and enter this permit’s NPDES ID, VAR10N325.

Start the watch

How often?
  • One permit holder — $99/month
  • One watershed — $2,990/year
  • One state — $4,990/year
  • The whole register — $18,000/year

How we handle your data → Privacy

Nearby on the register

Figures from EPA’s ICIS-NPDES download, loaded September 15, 2026.

What this page shows

The MAIN POINT SUBSTATION FINAL SITE AND GRADING PLAN is one of 2 storm water construction permits on EPA's NPDES register in Fort Lee, Virginia, and one of 44 NPDES permits in the Bailey Creek-James River subwatershed. The permit records list 0 pollutants under a numeric limit and 0 pollutants with an effluent exceedance.