Velarion Records
Follow this permit Velarion Records emails you this permit’s record, cited to the public filing, and tells you when the register changes it. Free.
We’ll email you a link to confirm. The continuous daily watch on every change is the paid alert. Unsubscribe any time.
Also free: The Pay Desk, the weekly executive pay briefing.

Clean Water Act discharge permit · NPDES WA0991014

WEYERHAEUSER NR COMPANY - LONGVIEW LUMBER, Longview, WA: NPDES WA0991014 discharge permit, effluent exceedances, inspections, penalties

WEYERHAEUSER NR COMPANY - LONGVIEW LUMBER, held by Unknown, holds NPDES permit WA0991014. EPA’s file records it issued July 17, 2019 and expiring July 31, 2024. The status and dates are as EPA’s permit file stood when Velarion loaded it (September 15, 2026); EPA’s free Detailed Facility Report on ECHO carries the permit’s current standing.

Identity

Facility as filedWEYERHAEUSER NR COMPANY - LONGVIEW LUMBER
Permittee as filedUnknown
NPDES IDWA0991014
Permit statusEffective
Permit typeIndividual permit
Discharger classMinor discharger
Facility typeNot a publicly owned treatment works
IssuedJuly 17, 2019
Expiration dateJuly 31, 2024
Issuing agencyState
AddressLongview, WA 98632
Receiving water impaired303(D) Listed
SubwatershedCity of Longview-Frontal Columbia River (HUC 170800030402)

Cited to the EPA ICIS-NPDES permit file (ECHO download).

Effluent limits and exceedances

An effluent exceedance is a discharge monitoring report value over the permit’s numeric limit (EPA’s violation code E90). A violation of any kind also counts a report not filed. Each row is EPA’s own count for that pollutant.

Pollutant or measureLimitsViolations, any kindEffluent exceedancesLatest exceedanceLargest exceedance, as filed
BOD, 5-day, 20 deg. C03026July 31, 202399,999% over the limit
Turbidity01717April 30, 2024
Oxygen, dissolved [DO]033November 30, 202227% over the limit
pH033August 31, 2023
Solids, settleable022January 31, 20231,400% over the limit
Copper, total [as Cu]022June 30, 202439% over the limit
Oil and grease, hexane extr method051May 31, 20207% over the limit
Solids, total suspended0100
Flow020

Cited to the EPA ICIS-NPDES limits and effluent violations files (ECHO download); up to 60 rows shown, most exceedances first.

Inspections, violations and enforcement

DateWhat EPA recordedAgency
August 24, 2026Effluent Violations - Unapproved BypassST6
August 24, 2026Permit Violations - Violation Specified in CommentST6
April 1, 2026Management Practice Violations - Laboratory Not CertifiedST6
February 11, 2024Reporting Violations - Improper/ Incorrect ReportingST6
February 10, 2024Reporting Violations - Improper/ Incorrect ReportingST6
August 27, 2023Reporting Violations - Failure to submit required report (non-DMR non-pretreatment)ST6
August 23, 2023Reporting Violations - Failure to NotifyST6
August 1, 2023Monitoring Violations - Analysis not ConductedST6
July 15, 2023Reporting Violations - Improper/ Incorrect ReportingST6
June 15, 2023Reporting Violations - Improper/ Incorrect ReportingST6
May 15, 2023Reporting Violations - Improper/ Incorrect ReportingST6
April 15, 2023Reporting Violations - Improper/ Incorrect ReportingST6
February 15, 2023Reporting Violations - Improper/ Incorrect ReportingST6
February 15, 2023Reporting Violations - Failure to submit required report (non-DMR non-pretreatment)ST6
February 2, 2023Permit Violations - Violation Specified in CommentST6
January 15, 2023Reporting Violations - Failure to submit required report (non-DMR non-pretreatment)ST6
January 12, 2023Reporting Violations - Failure to NotifyST6
December 26, 2022Reporting Violations - Failure to submit required report (non-DMR non-pretreatment)ST6
December 22, 2022Reporting Violations - Failure to NotifyST6
December 15, 2022Reporting Violations - Improper/ Incorrect ReportingST6
November 5, 2022Monitoring Violations - Frequency of Sampling ViolationST6
September 15, 2022Reporting Violations - Failure to submit required report (non-DMR non-pretreatment)ST6
September 3, 2022Monitoring Violations - Frequency of Sampling ViolationST6
August 30, 2022Permit Violations - Violation Specified in CommentST6
August 15, 2022Reporting Violations - Failure to submit required report (non-DMR non-pretreatment)ST6
July 9, 2022Monitoring Violations - Frequency of Sampling ViolationST6
July 2, 2022Monitoring Violations - Frequency of Sampling ViolationST6
June 1, 2022Permit Violations - Violation Specified in CommentST6
April 25, 2022Permit Violations - Violation Specified in CommentST6
April 2, 2022Monitoring Violations - Frequency of Sampling ViolationST6
March 12, 2022Monitoring Violations - Analysis not ConductedST6
December 31, 2021Monitoring Violations - Frequency of Sampling ViolationST6
December 31, 2021Monitoring Violations - Analysis not ConductedST6
December 31, 2021Monitoring Violations - Improper Analysis or Lab ErrorST6
December 4, 2021Monitoring Violations - Analysis not ConductedST6
October 3, 2020Monitoring Violations - Frequency of Sampling ViolationST6
September 5, 2020Monitoring Violations - Frequency of Sampling ViolationST6

Inspections

DateWhat EPA recordedAgency
April 1, 2026EvaluationS

Formal enforcement and penalties

1 formal actions, 1 of them with a penalty assessed. Federal and state penalties are separate figures from separate authorities and are shown as each was filed, never added together.

DateWhat EPA recordedAgencyFederal penaltyState or local penalty
September 8, 2026State CWA Penalty AOState$9,250

Informal enforcement

DateWhat EPA recordedAgency
June 17, 2026Notice of ViolationState
May 6, 2026Enforcement MeetingState
April 2, 2026Agency Enforcement ReviewState

Cited to the EPA ICIS-NPDES violation, inspection and enforcement files (ECHO download); up to 50 rows of each shown, newest first.

Watch this permit

One permit holder, $99/month. Watch the register for one permit holder and the places and receiving waters tied to its permits. Choose “One permit holder” and enter this permit’s NPDES ID, WA0991014.

Start the watch

How often?
  • One permit holder — $99/month
  • One watershed — $2,990/year
  • One state — $4,990/year
  • The whole register — $18,000/year

How we handle your data → Privacy

EPA publishes a free Detailed Facility Report for every permit on ECHO: its compliance status quarter by quarter, its inspections, and its enforcement actions and penalties. EPA also sends free notices of new inspections and enforcement actions through ECHO Notify; enter NPDES ID WA0991014 there.

WEYERHAEUSER NR COMPANY - LONGVIEW LUMBER, Longview, Washington: Individual permit WA0991014; Effective; issued July 17, 2019, term to July 31, 2024, by State.

  • BOD, 5-day, 20 deg. C: 0 limits, 30 violations of any kind, 26 effluent exceedances, latest July 31, 2023, largest 99,999% over the limit.
  • Turbidity: 0 limits, 17 violations of any kind, 17 effluent exceedances, latest April 30, 2024.
  • Oxygen, dissolved [DO]: 0 limits, 3 violations of any kind, 3 effluent exceedances, latest November 30, 2022, largest 27% over the limit.
  • pH: 0 limits, 3 violations of any kind, 3 effluent exceedances, latest August 31, 2023.
  • Solids, settleable: 0 limits, 2 violations of any kind, 2 effluent exceedances, latest January 31, 2023, largest 1,400% over the limit.
  • Copper, total [as Cu]: 0 limits, 2 violations of any kind, 2 effluent exceedances, latest June 30, 2024, largest 39% over the limit.
  • Oil and grease, hexane extr method: 0 limits, 5 violations of any kind, 1 effluent exceedance, latest May 31, 2020, largest 7% over the limit.
  • Solids, total suspended: 0 limits, 10 violations of any kind, 0 effluent exceedances.
  • Flow: 0 limits, 2 violations of any kind, 0 effluent exceedances.
  • September 8, 2026: State CWA Penalty AO (State), $9,250 state or local penalty.
  • August 24, 2026: Effluent Violations - Unapproved Bypass (ST6).
  • August 24, 2026: Permit Violations - Violation Specified in Comment (ST6).
  • June 17, 2026: Notice of Violation (State).
  • May 6, 2026: Enforcement Meeting (State).
  • April 2, 2026: Agency Enforcement Review (State).
  • April 1, 2026: Management Practice Violations - Laboratory Not Certified (ST6).
  • April 1, 2026: Evaluation (S).
  • February 11, 2024: Reporting Violations - Improper/ Incorrect Reporting (ST6).
  • February 10, 2024: Reporting Violations - Improper/ Incorrect Reporting (ST6).
  • August 27, 2023: Reporting Violations - Failure to submit required report (non-DMR non-pretreatment) (ST6).
  • August 23, 2023: Reporting Violations - Failure to Notify (ST6).
  • August 1, 2023: Monitoring Violations - Analysis not Conducted (ST6).
  • July 15, 2023: Reporting Violations - Improper/ Incorrect Reporting (ST6).
  • June 15, 2023: Reporting Violations - Improper/ Incorrect Reporting (ST6).
  • May 15, 2023: Reporting Violations - Improper/ Incorrect Reporting (ST6).
  • April 15, 2023: Reporting Violations - Improper/ Incorrect Reporting (ST6).
  • February 15, 2023: Reporting Violations - Improper/ Incorrect Reporting (ST6).
  • February 15, 2023: Reporting Violations - Failure to submit required report (non-DMR non-pretreatment) (ST6).
  • February 2, 2023: Permit Violations - Violation Specified in Comment (ST6).
  • January 15, 2023: Reporting Violations - Failure to submit required report (non-DMR non-pretreatment) (ST6).
  • January 12, 2023: Reporting Violations - Failure to Notify (ST6).
  • December 26, 2022: Reporting Violations - Failure to submit required report (non-DMR non-pretreatment) (ST6).
  • December 22, 2022: Reporting Violations - Failure to Notify (ST6).
  • December 15, 2022: Reporting Violations - Improper/ Incorrect Reporting (ST6).
  • November 5, 2022: Monitoring Violations - Frequency of Sampling Violation (ST6).
  • September 15, 2022: Reporting Violations - Failure to submit required report (non-DMR non-pretreatment) (ST6).
  • September 3, 2022: Monitoring Violations - Frequency of Sampling Violation (ST6).
  • August 30, 2022: Permit Violations - Violation Specified in Comment (ST6).
  • August 15, 2022: Reporting Violations - Failure to submit required report (non-DMR non-pretreatment) (ST6).
  • July 9, 2022: Monitoring Violations - Frequency of Sampling Violation (ST6).
  • July 2, 2022: Monitoring Violations - Frequency of Sampling Violation (ST6).
  • June 1, 2022: Permit Violations - Violation Specified in Comment (ST6).
  • April 25, 2022: Permit Violations - Violation Specified in Comment (ST6).
  • April 2, 2022: Monitoring Violations - Frequency of Sampling Violation (ST6).
  • March 12, 2022: Monitoring Violations - Analysis not Conducted (ST6).
  • December 31, 2021: Monitoring Violations - Frequency of Sampling Violation (ST6).
  • December 31, 2021: Monitoring Violations - Analysis not Conducted (ST6).
  • December 31, 2021: Monitoring Violations - Improper Analysis or Lab Error (ST6).
  • December 4, 2021: Monitoring Violations - Analysis not Conducted (ST6).
  • October 3, 2020: Monitoring Violations - Frequency of Sampling Violation (ST6).
  • September 5, 2020: Monitoring Violations - Frequency of Sampling Violation (ST6).

WEYERHAEUSER NR COMPANY - LONGVIEW LUMBER among its neighbors

EPA’s permit file holds 69 discharge permits in the City of Longview-Frontal Columbia River subwatershed (HUC 170800030402), WA0991014 among them.

Other permits in the City of Longview-Frontal Columbia River subwatershed (HUC 170800030402)

Nearby on the register

Figures from EPA’s ICIS-NPDES download, loaded September 15, 2026.

What this page shows

This permit register page covers NPDES permit WA0991014 for WEYERHAEUSER NR COMPANY - LONGVIEW LUMBER in Longview, WA, which is in the City of Longview-Frontal Columbia River watershed (HUC 170800030402). The facts list 7 pollutants with an effluent exceedance, 9 pollutants under a numeric limit, and 0 pollutants on file.