Clean Water Act discharge permit · NPDES WAR10F09D
ADAL FLIGHT SIMULATOR FACILITY 2048, Fairchild Afb, WA: NPDES WAR10F09D discharge permit, effluent exceedances, inspections, penalties
- Not neededPermit status
- MinorDischarger class
- 0Pollutants under a numeric limit
- 0Pollutants with an effluent exceedance
- 0Inspections on file
- 0Formal enforcement actions
ADAL FLIGHT SIMULATOR FACILITY 2048, held by NNAC, Inc., holds NPDES permit WAR10F09D.
ADAL FLIGHT SIMULATOR FACILITY 2048, Fairchild Afb, Washington: Coverage under a general permit WAR10F09D, held by NNAC, Inc.; Construction stormwater; Not needed.
Washington holds 4,744 Construction stormwater coverages of this permit type in EPA’s file. NNAC, Inc. holds 4 permits in Washington.
Other permits held by NNAC, Inc.
- PROJECT GJKZ1105385 REPAIR ROAD & UTILITIES EAKER AVE., FAIRCHILD AFB, WA, Fairchild Afb: WAR10F06E
- ADAL FLIGHT SIMULATOR FACILITY B2048, Fairchild Afb: WAR10F09C
- ADAL FLIGHT SIMULATOR PROJECT, B2048, FAIRCHILD AFB, WA, Fairchild Afb: WAR10F0AA, issued November 13, 2024
ADAL FLIGHT SIMULATOR FACILITY 2048 among its neighbors
EPA’s permit file holds 13 discharge permits in the Upper Hog Canyon Creek subwatershed (HUC 170601080601), WAR10F09D among them.
Other permits in the Upper Hog Canyon Creek subwatershed (HUC 170601080601)
- ADAL FLIGHT SIMULATOR FACILITY B2048, Fairchild Afb: WAR10F09C, not classed
- CONSOLIDATED FLIGHT BASE OPERATIONS FACILITY, Fairchild Afb: WAR10F0AR, minor permit, permit term to February 16, 2027
- CRAIG RD REALIGNMENT, Medical Lake: WAR311095, minor permit, permit term to December 31, 2025
- CRAIG ROAD SUBSTATION, Medical Lake: WAR315583, minor permit, permit term to December 31, 2030
- FAIRCHILD AIR FORCE BASE FAMILY CAMP EXTENSION, Fairchild Air Force Base: WAR10F09Z, not classed
- FUEL HYDRANT SYSTEM REPAIR, AIRCRAFT PARKING SPOTS 25-28, Fairchild Afb: WAR10F06N, minor permit, permit term to February 15, 2022
- MEDICAL LAKE MIDDLE SCHOOL ADDITIONS, Medical Lake: WAR124665, minor permit, permit term to December 16, 2010
- REPAIR (SUS) MILL-OVERLAY BONG STREET, FAIRCHILD AFB, WASHINGTON, Fairchild Afb: WAR10F05G, not classed
- REPAIR (SUS) WATER MAINS, SERE PHASE II, FAIRCHILD AIRFORCE BASE, WA, Fairchild Airforce Base: WAR10F08D, not classed
- SILVER LAKE (NORTH), SPOKANE COUNTY - LAKE TREATMENT, Unspecified: WAG994483, minor permit, permit term to March 21, 2026
What the register holds for ADAL FLIGHT SIMULATOR FACILITY 2048: its NPDES ID, its permit type and status, its its address in Fairchild Afb, Washington. EPA’s effluent violation file and its single-event violation file hold no violation for NPDES WAR10F09D.
Identity
| Facility as filed | ADAL FLIGHT SIMULATOR FACILITY 2048 |
|---|---|
| Permittee as filed | NNAC, Inc. |
| NPDES ID | WAR10F09D |
| Permit status | Not needed |
| Permit type | Coverage under a general permit |
| Discharger class | Minor discharger |
| Facility type | Not a publicly owned treatment works |
| Program | Construction stormwater |
| Address | Fairchild Afb, WA 99011 |
| Subwatershed | Upper Hog Canyon Creek (HUC 170601080601) |
Effluent limits and exceedances
- 0Pollutants on file
- 0Under a numeric limit
- 0With a violation of any kind
- 0With an effluent exceedance
EPA’s limits and effluent violation files hold no pollutant row for NPDES WAR10F09D.
Inspections, violations and enforcement
- 0Single-event violations
EPA’s single-event violation file, as loaded, holds no violation for NPDES WAR10F09D.
Inspections
EPA’s inspection file holds no inspection for NPDES WAR10F09D.
Formal enforcement and penalties
0 formal actions, 0 of them with a penalty assessed. Federal and state penalties are separate figures from separate authorities and are shown as each was filed, never added together.
Informal enforcement
EPA’s informal enforcement file holds no action for NPDES WAR10F09D.
Watch this permit
One permit holder, $99/month. Watch the register for one permit holder and the places and receiving waters tied to its permits. Choose “One permit holder” and enter this permit’s NPDES ID, WAR10F09D.
Start the watch
- One permit holder — $99/month
- One watershed — $2,990/year
- One state — $4,990/year
- The whole register — $18,000/year
How we handle your data → Privacy
Nearby on the register
- Discharge permits in Fairchild Afb
- Every permit record in Fairchild Afb, A to Z
- Discharge permits in Washington
- Every permit record in Washington, A to Z
Figures from EPA’s ICIS-NPDES download, loaded September 15, 2026.