Clean Water Act discharge permit · NPDES WAR10F0AV

FY24 P891 ELECTRICAL BACKBONE, Bremerton, WA: NPDES WAR10F0AV discharge permit, effluent exceedances, inspections, penalties

FY24 P891 ELECTRICAL BACKBONE, held by Absher Construction, holds NPDES permit WAR10F0AV. EPA’s file records it issued April 11, 2025 and expiring February 16, 2027. The status and dates are as EPA’s permit file stood when Velarion loaded it (September 15, 2026); EPA’s free Detailed Facility Report on ECHO carries the permit’s current standing.

What the register holds for FY24 P891 ELECTRICAL BACKBONE: its NPDES ID, its permit type and status, its dates, its address in Bremerton, Washington. EPA’s effluent violation file and its single-event violation file hold no violation for NPDES WAR10F0AV.

Identity

Facility as filedFY24 P891 ELECTRICAL BACKBONE
Permittee as filedAbsher Construction
NPDES IDWAR10F0AV
Permit statusEffective
Permit typeCoverage under a general permit
Discharger classMinor discharger
Facility typeNot a publicly owned treatment works
ProgramConstruction stormwater
IssuedApril 11, 2025
Expiration dateFebruary 16, 2027
Issuing agencyU.S. EPA
AddressBremerton, WA 98314
Receiving water impaired303(D) Listed
SubwatershedChico Creek-Frontal Sinclair Inlet (HUC 171100190705)
Other EPA IDs (FRS)RCRA handler WA3170090002; ICIS-AIR source WAPSC0005303521138

Cited to the EPA ICIS-NPDES permit file (ECHO download); cross-program IDs from EPA’s FRS facility-registry crosswalk.

Effluent limits and exceedances

EPA’s limits and effluent violation files hold no pollutant row for NPDES WAR10F0AV.

Cited to the EPA ICIS-NPDES limits and effluent violations files (ECHO download); up to 60 rows shown, most exceedances first.

Inspections, violations and enforcement

EPA’s single-event violation file, as loaded, holds no violation for NPDES WAR10F0AV.

Velarion’s copy of EPA’s ICIS-NPDES files does not include the inspections, formal enforcement actions and informal enforcement actions files, so this page shows none of them. EPA’s free Detailed Facility Report on ECHO lists this permit’s inspections, enforcement actions and penalties.

Cited to the EPA ICIS-NPDES violation, inspection and enforcement files (ECHO download); up to 50 rows of each shown, newest first.

Watch this permit

One permit holder, $99/month. Watch the register for one permit holder and the places and receiving waters tied to its permits. Choose “One permit holder” and enter this permit’s NPDES ID, WAR10F0AV.

Start the watch

How often?
  • One permit holder — $99/month
  • One watershed — $2,990/year
  • One state — $4,990/year
  • The whole register — $18,000/year

How we handle your data → Privacy

EPA publishes a free Detailed Facility Report for every permit on ECHO: its compliance status quarter by quarter, its inspections, and its enforcement actions and penalties. EPA also sends free notices of new inspections and enforcement actions through ECHO Notify; enter NPDES ID WAR10F0AV there.

Nearby on the register

Figures from EPA’s ICIS-NPDES download, loaded September 15, 2026.

What this page shows

The FY24 P891 Electrical Backbone storm water construction permit, held by Absher Construction in Bremerton, is one of 94 such permits in Kitsap County, and its April 11, 2025 issue date falls earlier than 85.1% of them. It also sits among 34 NPDES permits in the Chico Creek-Frontal Sinclair Inlet subwatershed, this one included. The permit has no pollutants under a numeric limit and no pollutants with an effluent exceedance on record, while 74.5% of the county's 94 storm water construction permits carry a violation on file.