- EffectivePermit status
- MinorDischarger class
- 0Pollutants under a numeric limit
- 0Pollutants with an effluent exceedance
- 0Inspections on file
- 0Formal enforcement actions
HISTORIC OXBOW REACTIVATION AND RESTORATION PROJECT, held by BCI Contracting, Inc., holds NPDES permit WAR10I044. EPA’s file records it issued April 9, 2026 and expiring February 16, 2027. The status and dates are as EPA’s permit file stood when Velarion loaded it (September 15, 2026); EPA’s free Detailed Facility Report on ECHO carries the permit’s current standing.
What the register holds for HISTORIC OXBOW REACTIVATION AND RESTORATION PROJECT: its NPDES ID, its permit type and status, its dates, its address in La Push, Washington. EPA’s effluent violation file and its single-event violation file hold no violation for NPDES WAR10I044.
Identity
| Facility as filed | HISTORIC OXBOW REACTIVATION AND RESTORATION PROJECT |
|---|---|
| Permittee as filed | BCI Contracting, Inc. |
| NPDES ID | WAR10I044 |
| Permit status | Effective |
| Permit type | Coverage under a general permit |
| Discharger class | Minor discharger |
| Facility type | Not a publicly owned treatment works |
| Program | Construction stormwater |
| Issued | April 9, 2026 |
| Expiration date | February 16, 2027 |
| Issuing agency | U.S. EPA |
| Address | La Push, WA 98350 |
| Subwatershed | Quillayute River (HUC 171001010608) |
Cited to the EPA ICIS-NPDES permit file (ECHO download).
Effluent limits and exceedances
- 0Pollutants on file
- 0Under a numeric limit
- 0With a violation of any kind
- 0With an effluent exceedance
EPA’s limits and effluent violation files hold no pollutant row for NPDES WAR10I044.
Cited to the EPA ICIS-NPDES limits and effluent violations files (ECHO download); up to 60 rows shown, most exceedances first.
Inspections, violations and enforcement
- 0Single-event violations
EPA’s single-event violation file, as loaded, holds no violation for NPDES WAR10I044.
Inspections
EPA’s inspection file holds no inspection for NPDES WAR10I044.
Formal enforcement and penalties
0 formal actions, 0 of them with a penalty assessed. Federal and state penalties are separate figures from separate authorities and are shown as each was filed, never added together.
Informal enforcement
EPA’s informal enforcement file holds no action for NPDES WAR10I044.
Cited to the EPA ICIS-NPDES violation, inspection and enforcement files (ECHO download); up to 50 rows of each shown, newest first.
Watch this permit
One permit holder, $99/month. Watch the register for one permit holder and the places and receiving waters tied to its permits. Choose “One permit holder” and enter this permit’s NPDES ID, WAR10I044.
Start the watch
- One permit holder — $99/month
- One watershed — $2,990/year
- One state — $4,990/year
- The whole register — $18,000/year
How we handle your data → Privacy
EPA publishes a free Detailed Facility Report for every permit on ECHO: its compliance status quarter by quarter, its inspections, and its enforcement actions and penalties. EPA also sends free notices of new inspections and enforcement actions through ECHO Notify; enter NPDES ID WAR10I044 there.
HISTORIC OXBOW REACTIVATION AND RESTORATION PROJECT, La Push, Washington: Coverage under a general permit WAR10I044, held by BCI Contracting, Inc.; Construction stormwater; Effective; issued April 9, 2026, term to February 16, 2027, by U.S. EPA.
Washington holds 4,744 Construction stormwater coverages of this permit type in EPA’s file; 4,633 were issued before WAR10I044. BCI Contracting, Inc. holds 4 permits in Washington.
Other permits held by BCI Contracting, Inc.
- LITTLE NACHES RIVER AND FLOODPLAIN RESTORATION, RM 3.3-4.3, Thorp: WAR10F07F
- QUILLAYUTE RIVER RESTORATION - REACH 3, La Push: WAR10I02N, issued June 20, 2022
- HISTORIC OXBOW REACTIVIATION AND RESTORATION, Forks: WAR315721, issued November 19, 2025
Coverages issued nearest WAR10I044
- March 27, 2026: NEW TAHOLAH SCHOOL K-12, Taholah, WAR10I042, held by Akana
- March 30, 2026: FRYINGPAN CREEK BRIDGE WA NP MORA 11(1), Packwood, WAR10F0CF, held by FHWA, Western Federal Lands Highway Division
- March 31, 2026: WEBBER CANYON SUBSTATION PROJECT - P03589, Prosser, WAR10F0CH, held by Bonneville Power Administration
- March 31, 2026: NEW TAHOLAH K12 SCHOOL, Taholah, WAR10I043, held by FORMA Construction Company
- April 6, 2026: JBLM PARACHUTE SURVIVAL TRAINING FACILITY, Jblm, WAR10F0CI, held by PacWest-Korte JV
- April 17, 2026: NAVFAC SEISMIC REPAIR DD4 BREMERTON - TOPSIDE PAVING, Bremerton, WAR10F0CJ, held by Kiewit-Alberici Joint Venture
- April 22, 2026: SEISMIC REPAIR DD4 BREMERTON - TOPSIDE PAVING, Bremerton, WAR10F0CK, held by NAVFAC NW
- April 24, 2026: REPAIR MISSILE HAUL ROUTE ROADS, SWFPAC NAVAL BASE KITSAP - BANGOR, WASHINGTON, Silverdale, WAR10F0CL, held by NH1 Joint Venture
- April 27, 2026: REPAIR MISSILE HAUL ROUTE, Silverdale, WAR10F0CM, held by NAVFAC NW
- April 27, 2026: I-5/4TH STREET AND 88TH STREET NE CORRIDOR IMPROVEMENTS PROJECT, Tulalip, WAR10I045, held by Tulalip Tribes of Washington
HISTORIC OXBOW REACTIVATION AND RESTORATION PROJECT among its neighbors
EPA’s permit file holds 3 discharge permits in the Quillayute River subwatershed (HUC 171001010608), WAR10I044 among them.
Other permits in the Quillayute River subwatershed (HUC 171001010608)
- HISTORIC OXBOW REACTIVIATION AND RESTORATION, Forks: WAR315721, minor permit, permit term to December 31, 2030
- QUILLAYUTE RIVER RESTORATION - REACH 3, La Push: WAR10I02N, minor permit, permit term to February 16, 2027
Nearby on the register
- Discharge permits in La Push
- Every permit record in La Push, A to Z
- Discharge permits in Washington
- Every permit record in Washington, A to Z
Figures from EPA’s ICIS-NPDES download, loaded September 15, 2026.