Velarion Records
Follow this permit Velarion Records emails you this permit’s record, cited to the public filing, and tells you when the register changes it. Free.
One more press on the next page sends it; there is no link to click in an email. The continuous daily watch on every change is the paid alert. Unsubscribe any time.
Also free: The Pay Desk, the weekly executive pay briefing.

Clean Water Act discharge permit · NPDES WAR309547

FIRESTONE RIDGE, Camas, WA: NPDES WAR309547 discharge permit, effluent exceedances, inspections, penalties

FIRESTONE RIDGE, held by Cascade West Development, Inc., holds NPDES permit WAR309547. EPA’s file records it issued November 18, 2020 and expiring December 31, 2025.

FIRESTONE RIDGE, Camas, Washington: Coverage under a general permit WAR309547, held by Cascade West Development, Inc.; Construction stormwater; Administratively continued (past its expiration date and still in force until reissued); issued November 18, 2020, term to December 31, 2025, by State.

  • Turbidity: 1 limit, 9 violations of any kind, 2 effluent exceedances, latest December 31, 2022.
  • pH: 2 limits, 14 violations of any kind, 0 effluent exceedances.
  • April 6, 2026: Evaluation (S).

Washington holds 4,744 Construction stormwater coverages of this permit type in EPA’s file; 1,658 were issued before WAR309547. Cascade West Development, Inc. holds 2 permits in Washington.

Other permits held by Cascade West Development, Inc.

Coverages issued nearest WAR309547

Other permits in Camas

Identity

Facility as filedFIRESTONE RIDGE
Permittee as filedCascade West Development, Inc.
NPDES IDWAR309547
Permit statusAdministratively continued (past its expiration date and still in force until reissued)
Permit typeCoverage under a general permit
Discharger classMinor discharger
Facility typeNot a publicly owned treatment works
ProgramConstruction stormwater
IssuedNovember 18, 2020
Expiration dateDecember 31, 2025
Issuing agencyState
AddressCamas, WA 98607
SIC1794 – Excavation Work

Effluent limits and exceedances

An effluent exceedance is a discharge monitoring report value over the permit’s numeric limit (EPA’s violation code E90). A violation of any kind also counts a report not filed. Each row is EPA’s own count for that pollutant.

Pollutant or measureLimitsViolations, any kindEffluent exceedancesLatest exceedanceLargest exceedance, as filed
Turbidity192December 31, 2022
pH2140

Inspections, violations and enforcement

EPA’s single-event violation file, as loaded, holds no violation for NPDES WAR309547.

Inspections

DateWhat EPA recordedAgency
April 6, 2026EvaluationS

Formal enforcement and penalties

0 formal actions, 0 of them with a penalty assessed. Federal and state penalties are separate figures from separate authorities and are shown as each was filed, never added together.

Informal enforcement

EPA’s informal enforcement file holds no action for NPDES WAR309547.

Watch this permit

One permit holder, $99/month. Watch the register for one permit holder and the places and receiving waters tied to its permits. Choose “One permit holder” and enter this permit’s NPDES ID, WAR309547.

Start the watch

How often?
  • One permit holder — $99/month
  • One watershed — $2,990/year
  • One state — $4,990/year
  • The whole register — $18,000/year

How we handle your data → Privacy

Nearby on the register

Figures from EPA’s ICIS-NPDES download, loaded October 14, 2026.

What this page shows

This public-records page covers NPDES permit WAR309547 for the FIRESTONE RIDGE facility in Camas, WA, held by Cascade West Development, Inc., a minor discharger under construction stormwater coverage with an administratively continued status. The file lists 2 pollutants on file, 2 under a numeric limit, 2 with a violation of any kind, and 1 with an effluent exceedance.