Clean Water Act discharge permit · NPDES WAR312656

CITY OF UNION GAP (COUG) REGIONAL BELTWAY CONNECTOR (RBC) PROJECT, Union Gap, WA: NPDES WAR312656 discharge permit, effluent exceedances, inspections, penalties

CITY OF UNION GAP (COUG) REGIONAL BELTWAY CONNECTOR (RBC) PROJECT, held by City of Union Gap, holds NPDES permit WAR312656. EPA’s file records it issued November 18, 2020 and expiring December 31, 2025.

CITY OF UNION GAP (COUG) REGIONAL BELTWAY CONNECTOR (RBC) PROJECT, Union Gap, Washington: Coverage under a general permit WAR312656, held by City of Union Gap; Construction stormwater; Administratively continued (past its expiration date and still in force until reissued); issued November 18, 2020, term to December 31, 2025, by State.

  • pH: 4 limits, 140 violations of any kind, 0 effluent exceedances.
  • Turbidity: 2 limits, 70 violations of any kind, 0 effluent exceedances.

Washington holds 4,744 Construction stormwater coverages of this permit type in EPA’s file; 1,658 were issued before WAR312656. City of Union Gap holds 2 permits in Washington.

Other permits held by City of Union Gap

Coverages issued nearest WAR312656

CITY OF UNION GAP (COUG) REGIONAL BELTWAY CONNECTOR (RBC) PROJECT among its neighbors

EPA’s permit file holds 21 discharge permits in the Lower Wide Hollow Creek subwatershed (HUC 170300030205), WAR312656 among them.

Other permits in the Lower Wide Hollow Creek subwatershed (HUC 170300030205)

Identity

Facility as filedCITY OF UNION GAP (COUG) REGIONAL BELTWAY CONNECTOR (RBC) PROJECT
Permittee as filedCity of Union Gap
NPDES IDWAR312656
Permit statusAdministratively continued (past its expiration date and still in force until reissued)
Permit typeCoverage under a general permit
Discharger classMinor discharger
Facility typeNot a publicly owned treatment works
ProgramConstruction stormwater
IssuedNovember 18, 2020
Expiration dateDecember 31, 2025
Issuing agencyState
AddressUnion Gap, WA 98903
Receiving water impaired303(D) Listed
SubwatershedLower Wide Hollow Creek (HUC 170300030205)

Effluent limits and exceedances

An effluent exceedance is a discharge monitoring report value over the permit’s numeric limit (EPA’s violation code E90). A violation of any kind also counts a report not filed. Each row is EPA’s own count for that pollutant.

Pollutant or measureLimitsViolations, any kindEffluent exceedancesLatest exceedanceLargest exceedance, as filed
pH41400
Turbidity2700

EPA’s effluent violation file records no exceedance of a numeric limit for NPDES WAR312656.

Inspections, violations and enforcement

EPA’s single-event violation file, as loaded, holds no violation for NPDES WAR312656.

Inspections

EPA’s inspection file holds no inspection for NPDES WAR312656.

Formal enforcement and penalties

0 formal actions, 0 of them with a penalty assessed. Federal and state penalties are separate figures from separate authorities and are shown as each was filed, never added together.

Informal enforcement

EPA’s informal enforcement file holds no action for NPDES WAR312656.

Watch this permit

One permit holder, $99/month. Watch the register for one permit holder and the places and receiving waters tied to its permits. Choose “One permit holder” and enter this permit’s NPDES ID, WAR312656.

Start the watch

How often?
  • One permit holder — $99/month
  • One watershed — $2,990/year
  • One state — $4,990/year
  • The whole register — $18,000/year

How we handle your data → Privacy

Nearby on the register

Figures from EPA’s ICIS-NPDES download, loaded September 15, 2026.

What this page shows

This public-records page covers Clean Water Act NPDES permit WAR312656 for the City of Union Gap's Regional Beltway Connector project in Union Gap, WA, a construction stormwater permit administratively continued after its listed expiration date. The page lists a minor discharger class, 0 pollutants under a numeric limit, and 0 pollutants with an effluent exceedance, with the permit issued November 18, 2020 and expiring December 31, 2025, as the EPA file stood when loaded on September 15, 2026. The receiving water is listed as impaired (303(D)) in the Lower Wide Hollow Creek subwatershed, HUC 170300030205.