Watershed · by program
Storm Water Construction discharge permits in subbasin 02020002
- 10Permits
- 20Permits in the subbasin
- 1States the subbasin touches
10 of the 20 Clean Water Act discharge permits in hydrologic subbasin 02020002 are filed as Storm Water Construction. A subbasin is a watershed unit, not a political one, so it crosses state lines: this one is named on permits in NY.
A cut is one value of one dimension of a subbasin — Storm Water Construction, under program. This page holds the permits in subbasin 02020002 that carry that value: 10 of the 20 the subbasin holds, and the 5 other cuts of the subbasin are listed at the foot of the page, each with its own count.
Where the subbasin lies
- NY 20 permits in the subbasin
Other cuts of subbasin 02020002
- program: POTW 3
- program: Storm Water Industrial 4
- major or minor: Minor dischargers 20
- permit type: General permit coverage 15
- permit type: Individual permits 4
Every discharge permit in subbasin 02020002 →
Figures from EPA’s ICIS-NPDES download.
What this page shows
This page lists Clean Water Act discharge permits in watershed 02020002 under the Storm Water Construction program. It shows 10 permits on this page, out of 20 permits in the whole watershed located in NY.