Watershed · by program
Storm Water Construction discharge permits in subbasin 11080001
- 12Permits
- 19Permits in the subbasin
- 2States the subbasin touches
12 of the 19 Clean Water Act discharge permits in hydrologic subbasin 11080001 are filed as Storm Water Construction. A subbasin is a watershed unit, not a political one, so it crosses state lines: this one is named on permits in NM, WY.
A cut is one value of one dimension of a subbasin — Storm Water Construction, under program. This page holds the permits in subbasin 11080001 that carry that value: 12 of the 19 the subbasin holds, and the 4 other cuts of the subbasin are listed at the foot of the page, each with its own count.
Where the subbasin lies
Other cuts of subbasin 11080001
- program: Storm Water Industrial 3
- major or minor: Minor dischargers 18
- permit type: General permit coverage 15
- permit type: Individual permits 4
Every discharge permit in subbasin 11080001 →
Figures from EPA’s ICIS-NPDES download.
What this page shows
This page covers Clean Water Act discharge permits in watershed 11080001, broken down by program. It lists 12 Storm Water Construction permits. The whole watershed holds 18 permits in NM and 1 in WY, for 19 permits across all cuts.