Watershed · by program
Storm Water Construction discharge permits in subbasin 17070101
- 27Permits
- 57Permits in the subbasin
- 2States the subbasin touches
27 of the 57 Clean Water Act discharge permits in hydrologic subbasin 17070101 are filed as Storm Water Construction. A subbasin is a watershed unit, not a political one, so it crosses state lines: this one is named on permits in WA, OR.
A cut is one value of one dimension of a subbasin — Storm Water Construction, under program. This page holds the permits in subbasin 17070101 that carry that value: 27 of the 57 the subbasin holds, and the 4 other cuts of the subbasin are listed at the foot of the page, each with its own count.
Where the subbasin lies
Other cuts of subbasin 17070101
- program: Storm Water Industrial 3
- major or minor: Minor dischargers 53
- permit type: General permit coverage 49
- permit type: Individual permits 8
Every discharge permit in subbasin 17070101 →
Figures from EPA’s ICIS-NPDES download.
What this page shows
This page lists Clean Water Act discharge permits for Storm Water Construction in watershed 17070101, showing 27 permits. The whole watershed contains 38 permits in WA and 19 permits in OR, for 57 permits across all cuts.