Clean Water Act discharge permit · NPDES WIR10I05P

ONEIDA TRACK AND FIELD, Oneida, WI: NPDES WIR10I05P discharge permit, effluent exceedances, inspections, penalties

ONEIDA TRACK AND FIELD, held by Vinton Construction, holds NPDES permit WIR10I05P. EPA’s file records it issued March 11, 2026 and expiring February 17, 2027.

ONEIDA TRACK AND FIELD, Oneida, Wisconsin: Coverage under a general permit WIR10I05P, held by Vinton Construction; Construction stormwater; Effective; issued March 11, 2026, term to February 17, 2027, by U.S. EPA.

Wisconsin holds 128 Construction stormwater coverages of this permit type in EPA’s file; 101 were issued before WIR10I05P. Vinton Construction holds 7 permits in Wisconsin.

Other permits held by Vinton Construction

Coverages issued nearest WIR10I05P

ONEIDA TRACK AND FIELD among its neighbors

EPA’s permit file holds 8 discharge permits in the Oneida Creek subwatershed (HUC 040302040103), WIR10I05P among them.

Other permits in the Oneida Creek subwatershed (HUC 040302040103)

What the register holds for ONEIDA TRACK AND FIELD: its NPDES ID, its permit type and status, its dates, its address in Oneida, Wisconsin. EPA’s effluent violation file and its single-event violation file hold no violation for NPDES WIR10I05P.

Identity

Facility as filedONEIDA TRACK AND FIELD
Permittee as filedVinton Construction
NPDES IDWIR10I05P
Permit statusEffective
Permit typeCoverage under a general permit
Discharger classMinor discharger
Facility typeNot a publicly owned treatment works
ProgramConstruction stormwater
IssuedMarch 11, 2026
Expiration dateFebruary 17, 2027
Issuing agencyU.S. EPA
AddressOneida, WI 54155
SubwatershedOneida Creek (HUC 040302040103)

Effluent limits and exceedances

EPA’s limits and effluent violation files hold no pollutant row for NPDES WIR10I05P.

Inspections, violations and enforcement

EPA’s single-event violation file, as loaded, holds no violation for NPDES WIR10I05P.

Inspections

EPA’s inspection file holds no inspection for NPDES WIR10I05P.

Formal enforcement and penalties

0 formal actions, 0 of them with a penalty assessed. Federal and state penalties are separate figures from separate authorities and are shown as each was filed, never added together.

Informal enforcement

EPA’s informal enforcement file holds no action for NPDES WIR10I05P.

Watch this permit

One permit holder, $99/month. Watch the register for one permit holder and the places and receiving waters tied to its permits. Choose “One permit holder” and enter this permit’s NPDES ID, WIR10I05P.

Start the watch

How often?
  • One permit holder — $99/month
  • One watershed — $2,990/year
  • One state — $4,990/year
  • The whole register — $18,000/year

How we handle your data → Privacy

Nearby on the register

Figures from EPA’s ICIS-NPDES download, loaded September 15, 2026.

What this page shows

ONEIDA TRACK AND FIELD is one of 11 storm water construction permits in Oneida, Wisconsin, including this one, and it sits among 8 NPDES permits in the Oneida Creek subwatershed. Of the 8 storm water construction permits in Oneida, 87.5% were issued before this one, which was issued on March 11, 2026. Among the 11 storm water construction permits in Oneida, 0.0% have a violation on file, and this permit has no pollutants under a numeric limit and no effluent exceedances.